CA Flats Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: California Flats solar farm
CA Flats Solar is an operating solar photovoltaic (PV) farm in San Luis Obispo County, California, United States.
Project Details
Table 1: Phase-level project details for CA Flats Solar
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2017[1] | 130 MWac[1] | PV[1] | Capital Dynamics[2] | Capital Dynamics[1] |
2 | Operating[1] | 2019[1] | 150 MWac[1] | PV[1] | Capital Dynamics[2] | CD Arevon USA INC[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for CA Flats Solar
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | San Luis Obispo County, California, United States[3] | 35.8690, -120.3400 (exact)[4] |
2 | San Luis Obispo County, California, United States[3] | 35.8400, -120.3050 (exact)[5] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ 2.0 2.1 https://www.renewablesnow.com/news/capital-dynamics-bags-tax-equity-for-60-mw240-mwh-california-flats-battery-749704/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.
- ↑ WKSL2023
- ↑ WKSL2023