Dabieshan power station (中煤集团大别山电厂三期 2×1000MW清洁煤电扩建工程, 中电国际黄冈大别山发电厂) is an operating power station of at least 2600-megawatts (MW) in Zhongguanyi Town, Macheng, Huanggang, Hubei, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Dabieshan power station Zhongguanyi Town, Macheng, Huanggang, Hubei, China 31.1420662, 114.8921871 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8: 31.1420662, 114.8921871

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Phase I Unit 1 Operating coal: bituminous[2] 640 supercritical 2008 False
Phase I Unit 2 Operating coal: bituminous[2] 640 supercritical 2008 False
Phase II Unit 3 Operating coal: bituminous[2] 660 supercritical 2020 False
Phase II Unit 4 Operating coal: bituminous[2] 660 supercritical 2020 False
Phase III Unit 5 Construction[3] coal: unknown[2][1] 1000[1] ultra-supercritical[1] – False
Phase III Unit 6 Construction[3] coal: unknown[2][1] 1000[1] ultra-supercritical[1] – False
Phase IV Unit 7 Announced[4] coal: unknown[2][4] 1000[4] ultra-supercritical[4] – False
Phase IV Unit 8 Announced[4] coal: unknown[2][4] 1000[4] ultra-supercritical[4] – False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase III Unit 5 Xinyuan Ronghe (Beijing) Power Co Ltd [100%][1] China Coal Energy Co Ltd [50.0%]; State Power Investment Corp Ltd [50.0%]
Phase III Unit 6 Xinyuan Ronghe (Beijing) Power Co Ltd [100%][1] China Coal Energy Co Ltd [50.0%]; State Power Investment Corp Ltd [50.0%]
Phase IV Unit 7 Huanggang Dabieshan Power Co Ltd [100%] Huaihe Energy Holding Group Co Ltd [34.8%]; China National Coal Group [30.6%]; China Power International Development Co Ltd [20.4%]; unknown [10.7%]; China Cinda Asset Management Co Ltd [3.5%]
Phase IV Unit 8 Huanggang Dabieshan Power Co Ltd [100%] Huaihe Energy Holding Group Co Ltd [34.8%]; China National Coal Group [30.6%]; China Power International Development Co Ltd [20.4%]; unknown [10.7%]; China Cinda Asset Management Co Ltd [3.5%]

Project-level coal details

  • Coal source(s): domestic/imported

Background

The first two coal-fired units of Dabieshan power station, totaling 1,280 MW, were brought online in 2008. The plant is majority-owned by China Power Investment Corporation (CPI).[5]

First Expansion (Phase II)

In 2014, CPI planned to build additional coal-fired units at this plant, units 3-4 with a total capacity of 1,320 MW.[6][7]

Construction on the expansion began in August 2016, despite 2016 China regulations that suspended the building of new plants in the province until 2018.[8] However, because the plant is a government poverty reduction project, it is likely exempted from the restrictions on new coal plant builds.[9] It is planned for operation in 2019.[10]

Unit 3 was commissioned in May 2020.[11] Unit 4 was commissioned in December 2020.[12]

Second Expansion Proposed (Phase III)

Two additional 1,000 MW units were listed in Hubei Province's power development 14th Five-Year-Plan in November 2022.[13] The two units were permitted in January 2023, according to news reporting.[14]

In October 2024, the EPC total contract tender was announced[15], and a construction launch ceremony was held in October 2024[16]. Construction milestones followed, including boiler steel frame erection in November 2024[17][18], main plant construction started in January 2025[19], and boiler large plate beam hoisting in May 2025.[20]. Further progress in 2025 included the toppling of cooling towers[21][22] and the placement of transformers[23].

In early 2026, the generator rotor was inserted[24], the boiler hydrostatic test was completed[25], and the turbine cylinder was bucked[26]. Unit 5 achieved grid connection in July 2026[27].

Unit 6's boiler steel frame erection occurred in January 2025[28], main plant construction progressed in February 2025[29], and the deaerator was positioned in October 2025[30].

Third Expansion Proposed (Phase IV)

A feasibility study review meeting was held in April 2025[31], and preliminary work was discussed in early 2026[32], but no further news has been reported since then.

Ownership

In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[33]

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://news.bjx.com.cn/html/20230302/1292011.shtml. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 "2×1000MW!中煤大别山电厂三期清洁煤电扩建工程启动-北极星火力发电网". news.bjx.com.cn. 2024-10-31. Archived from the original on 2025-06-30. Retrieved 2024-11-01.
  4. ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://news.bjx.com.cn/html/20250430/1439618.shtml. {{cite web}}: Missing or empty |title= (help)
  5. ↑ "美丽电厂中国行—中电投大别山发电有限公司", 电站资讯网, 2014-04-30
  6. ↑ "中电投大别山电厂二期工程可研报告通过评审",中国机经网, 2014-03-20
  7. ↑ "黄冈大别山发电有限责任公司二期扩建工程灰场运灰道路穿越高速铁路安全评估及设计招标公告," dlztb.org, 2015-5-3
  8. ↑ "湖北大别山电厂二期项目涉嫌首个违反煤电“急刹车”政策," 北极星电力网, 2016-08-02
  9. ↑ Communication with Greenpeace East Asia, July 3, 2017
  10. ↑ "黄冈大别山发电有限责任公司招聘公告," 中电国际 , 2017.09.06
  11. ↑ "2×660MW!大别山发电厂二期扩建工程顺利通过168小时试运行," 北极星电力网新闻中心, 2020/5/25
  12. ↑ "660MW!大别山4号机组一次性通过168小时满负荷试运行 - 北极星火力发电网". news.bjx.com.cn. 2020-12-28. Retrieved 2020-12-31.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "2×1000MW!国家电投大别山发电三期扩建项目纳入湖北省“十四五”电力建设规划," BJX, 2022-11-28
  14. ↑ [https://news.bjx.com.cn/html/20230302/1292011.shtml 湖北3个煤电大项目同日核准:4×1000MW+2×660MW!} BJX, 2023-03-02
  15. ↑ "大别山电厂三期2×1000MW清洁煤电扩建工程EPC总承包项目中标候选人公示". BJX. 2024-10-08. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "中煤大别山电厂三期2×1000MW清洁煤电扩建工程高质量建设启动仪式". WeChat. 2024-10-30. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "大别山电厂三期2×1000兆瓦清洁煤电扩建项目5号锅炉钢架第一根立柱吊装就位". BJX. 2024-11-20. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "大别山电厂三期2×1000兆瓦清洁煤电扩建项目A标段锅炉钢架顺利开吊". WeChat. 2024-11-18. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "中煤大别山电厂三期2×1000兆瓦清洁煤电扩建项目5号机组主厂房高标准出零米". BJX. 2025-01-25. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "大别山电厂三期2X1000兆瓦清洁煤电扩建项目5号锅炉大板梁顺利吊装完成". WeChat. 2025-05-27. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ "大别山电厂三期2×1000兆瓦清洁煤电扩建项目5号、6号冷却塔筒壁顺利实现双到顶". WeChat. 2025-09-30. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  22. ↑ "大别山电厂三期2×1000兆瓦清洁煤电扩建项目5号、6号冷却塔结构到顶". WeChat. 2025-10-08. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  23. ↑ "中煤大别山三期2×1000MW扩建项目5号、6号主变压器顺利就位". WeChat. 2025-11-13. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  24. ↑ "大别山电厂三期2×1000兆瓦清洁煤电扩建项目5号机组发电机转子穿装一次成功". WeChat. 2025-12-28. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  25. ↑ "中煤大别山三期2×1000MW扩建项目5号机组锅炉水压试验一次成功". WeChat. 2026-02-08. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  26. ↑ "湖北大别山项目5号机组汽轮机扣盖一次成功". WeChat. 2026-03-30. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  27. ↑ "大别山电厂三期2×1000兆瓦清洁煤电扩建项目5号机组首次并网一次成功". BJX. 2026-07-07. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  28. ↑ "大别山电厂三期项目6号机组锅炉第一根钢架顺利吊装". WeChat. 2025-01-22. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  29. ↑ "大别山电厂三期2×1000兆瓦清洁煤电扩建项目6号主厂房"出零米"". BJX. 2025-02-10. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  30. ↑ "大别山三期项目6号机组主厂房除氧器顺利就位". WeChat. 2025-10-02. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  31. ↑ "电力规划设计总院组织召开大别山电厂四期2×1000MW高效清洁煤电项目可行性研究报告审查会". BJX. 2025-04-30. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  32. ↑ "麻城市领导与央企领导商讨推进大别山电厂四期和中煤(湖北)产业园等重大项目前期准备工作". WeChat. 2026-03-30. Retrieved 2026-07-17.{{cite web}}: CS1 maint: url-status (link)
  33. ↑ "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.