C D Mcintosh Jr solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Chambers County Solar
C D Mcintosh Jr solar farm is an announced solar farm in Lakeland, Polk County, Florida, United States.
Project Details
The solar farm has one phase that is at least 20 MW. (Read more about solar capacity ratings.)
Table 1: Phase-level project details for C D Mcintosh Jr solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Owner | Operator |
---|---|---|---|---|---|
1 | Announced[1] | 2024 (planned)[1] | 50 MWac[1] | City of Lakeland - (FL) [60.0%]; Orlando Utilities Comm [40.0%][1] | City of Lakeland - (FL)[1] |
Location
Table 2: Phase-level location details for C D Mcintosh Jr solar farm
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Lakeland, Polk County, Florida, United States[1] | 28.0801, -81.9229 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.