Cabin Creek Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Cabin Creek Solar is an operating solar photovoltaic (PV) farm in Fallon, Fallon County, Montana, United States.
Project Details
Table 1: Phase-level project details for Cabin Creek Solar
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Shelved[1] | – | 75 MWac[2] | PV[2] | Clenera LLC [100%][3] | Clenera LLC[2] |
2 | Shelved[1] | – | 75 MWac[2] | PV[2] | Clenera LLC [100%][3] | Clenera LLC[2] |
3 | Operating[2] | 2023[2] | 70 MWac[2] | PV[2] | Cypress Creek Renewables [100%][4] | Cypress Creek Renewables[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Cabin Creek Solar
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Fallon, Fallon County, Montana, United States[2] | 46.4098, -104.4291 (exact)[2] |
2 | Fallon, Fallon County, Montana, United States[2] | 46.3895, -104.3183 (exact)[2] |
3 | Montgomery County, North Carolina, United States[2] | 35.336, -79.7417 (exact)[2] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240206195024/https://pv-magazine-usa.com/2020/06/22/montanas-largest-solar-project-has-a-power-contract/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206194926/https://www.tdworld.com/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)