Cabo Leones wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Cabo Leones wind farm (Parque Eólico Cabo Leones) is an operating wind farm in Freirina, Provincia de Huasco, Huasco, Atacama Region, Chile.
Project Details
Table 1: Phase-level project details for Cabo Leones wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2017[1] | 116 MW[2] | Onshore[3] | Grupo Ibereólica Renovables; EDF Renewables (法國電力再生能源公司)[1][1] | – |
2 | Operating[4] | 2021[1] | 205 MW[1] | Onshore[4] | Grupo Ibereólica Renovables; EDF Renewables (法國電力再生能源公司)[1][1] | Global Power Generation[4] |
3 | Operating[5] | 2021[6] | 110 MW[6] | Onshore[5] | Grupo Ibereólica Renovables [50%]; Repsol SA [50%][1][1] | Repsol Ibereólica Renovables[7] |
Location
Table 2: Phase-level location details for Cabo Leones wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Freirina, Provincia de Huasco, Huasco, Atacama Region, Chile[8] | -28.9274, -71.4445 (exact)[8] |
2 | Freirina, Provincia de Huasco, Huasco, Atacama Region, Chile[9] | -28.9768, -71.4452 (exact)[9] |
3 | Atacama, Huasco, Atacama, Chile[2] | -28.995, -70.3738 (approximate)[2] |
The map below shows the locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://web.archive.org/web/20240125170307/https://www.grupoibereolica.com/desarrollo/parque-eolico-cabo-leones-i/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240125170338/https://www.caboleones1.cl/parque-eolico/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126080343/https://generadoras.cl/empresas-asociadas/edf. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240125171456/https://generadoras.cl/empresas-asociadas/gpg. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20220624040952/http://generadoras.cl/empresas-asociadas/repsol-ibereolica. Archived from the original on 24 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20240125170311/https://www.energiaestrategica.com/siemens-gamesa-cerro-contrato-por-110-mw-para-otra-etapa-del-parque-eolico-cabo-leones-en-chile/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240130235634/https://www.caboleones1.cl/nuestros-socios/. Archived from the original on 30 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20240131175537/https://www.thewindpower.net/windfarm_en_23321.php. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20240131175505/https://www.thewindpower.net/windfarm_en_25097.php. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)