Cabo Leones wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Cabo Leones wind farm (Parque Eólico Cabo Leones) is an operating wind farm in Freirina, Provincia de Huasco, Huasco, Atacama Region, Chile.

Project Details

Table 1: Phase-level project details for Cabo Leones wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2017[1] 116 MW[2] Onshore[3] Grupo Ibereólica Renovables; EDF Renewables[1]
2 Operating[4] 2021[1] 205 MW[1] Onshore[4] Grupo Ibereólica Renovables; EDF Renewables[1] Global Power Generation (GPG)[4]
3 Operating[5] 2021[6] 110 MW[6] Onshore[5] Grupo Ibereólica Renovables [50%]; Repsol [50%][1] Repsol Ibereólica Renovables[7]

Location

Table 2: Phase-level location details for Cabo Leones wind farm

Phase Name Location Coordinates (WGS 84)
1 Freirina, Provincia de Huasco, Huasco, Atacama Region, Chile[2][8] -28.9274, -71.4445 (exact)[8]
2 Freirina, Provincia de Huasco, Huasco, Atacama Region, Chile[9][2] -28.9768, -71.4452 (exact)[9]
3 Atacama, Huasco, Atacama, Chile[6][2] -28.995, -70.3738 (approximate)[2]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.grupoibereolica.com/desarrollo/parque-eolico-cabo-leones-i/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://www.caboleones1.cl/parque-eolico/. {{cite web}}: Missing or empty |title= (help)
  3. http://generadoras.cl/empresas-asociadas/edf. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 http://generadoras.cl/empresas-asociadas/gpg. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 http://generadoras.cl/empresas-asociadas/repsol-ibereolica. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://www.energiaestrategica.com/siemens-gamesa-cerro-contrato-por-110-mw-para-otra-etapa-del-parque-eolico-cabo-leones-en-chile/. {{cite web}}: Missing or empty |title= (help)
  7. https://www.caboleones1.cl/nuestros-socios/. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://www.thewindpower.net/windfarm_en_23321.php. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://www.thewindpower.net/windfarm_en_25097.php. {{cite web}}: Missing or empty |title= (help)