Cadence Solar Project
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Cadence Solar Energy Center
Cadence Solar Project is a solar photovoltaic (PV) farm under construction in York Township, Union County, Ohio, United States.
Project Details
Table 1: Phase-level project details for Cadence Solar Project
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
|---|---|---|---|---|---|
| CADNC | Construction[1] | 2026 (planned)[1] | 240 MWac[1] | PV[1] | Invenergy LLC [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Cadence Solar Project
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| CADNC | York Township, Union County, Ohio, United States[1] | 40.3780, -83.4369 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ https://web.archive.org/web/20240201182006/https://cadencesolar.invenergy.com/. Archived from the original on 2024-02-01.
{{cite web}}: Missing or empty|title=(help)
