Camino Solar Hybrid

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Camino Solar Hybrid is a solar farm in pre-construction in Rosamond, Kern County, California, United States.


Project Details

Table 1: Phase-level project details for Camino Solar Hybrid

Status Commissioning year Nameplate capacity Technology Owner Operator
Pre-construction[1] 2023 (planned)[2] 44 MWac[2] PV[2] Avangrid Renewables[3] Avangrid Renewables[2]

Read more about solar capacity ratings.


Location

Table 2: Phase-level location details for Camino Solar Hybrid

Location Coordinates (WGS 84)
Rosamond, Kern County, California, United States[4] 34.9303, -118.4432 (exact)[2]

The map below shows the exact location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. "Blm Authorizes Camino Solar Project In Kern County - Bureau Of Land Management". Blm. Archived from the original on December 30, 2020. Retrieved February 14, 2022.
  2. 2.0 2.1 2.2 2.3 2.4 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022. {{cite web}}: Check date values in: |archive-date= (help)
  3. "files.ceqanet.opr.ca.gov/70378-2/attachment/YJEFjPryJtxPbccmAheCKvcePEC8ZB4_RU9wfVYQQbiYmvTgrVbZjkGPq25JU3I1_7Ta81wXDfxzxUar0". Archived from the original on February 7, 2022. Retrieved February 14, 2022.
  4. "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.