Campo Arañuelo (Naturgy) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Campo Arañuelo (Naturgy) solar farm is a solar photovoltaic (PV) farm in pre-construction in Jara-Ibores, Cáceres, Extremadura, Spain.

Project Details

Table 1: Phase-level project details for Campo Arañuelo (Naturgy) solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Pre-construction[1] 2026 (planned)[2] 269.6 MWac[3] PV[4] Naturgy Energy Group SA [100%][5] Naturgy Energy Group[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Campo Arañuelo (Naturgy) solar farm

Location Coordinates (WGS 84)
Jara-Ibores, Cáceres, Extremadura, Spain[4] 39.5266, -5.6307 (approximate)[4]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-3206, https://www.elespanol.com/invertia/empresas/energia/20240220/naturgy-logra-permisos-empezar-obras-mayor-fotovoltaica-espana-operara-partir/833916979_0.html https://www.pv-magazine.es/2023/01/20/mas-de-3-gws-fotovoltaicos-aprobados-en-enero-segun-el-boe/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-3206, https://www.elespanol.com/invertia/empresas/energia/20240220/naturgy-logra-permisos-empezar-obras-mayor-fotovoltaica-espana-operara-partir/833916979_0.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. "Naturgy logra los permisos para empezar las obras de su mayor fotovoltaica en España, que operará a partir de 2026". El Español. 2024-02-20. Archived from the original on 2024-04-01. Retrieved 2024-03-07.
  3. "BOE-A-2024-3206 Resolución de 7 de febrero de 2024, de la Dirección General de Política Energética y Minas, por la que se otorga a Naturgy Renovables, SLU, autorización administrativa previa de las modificaciones y autorización administrativa de construcción para la instalación fotovoltaica "Campo de Arañuelo", de 269,61 MW". Boletín Oficial del Estado. 2024-02-19. Archived from the original on 2024-04-01. Retrieved 2024-03-07.
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240126150225/https://www.pv-magazine.es/2023/01/20/mas-de-3-gws-fotovoltaicos-aprobados-en-enero-segun-el-boe/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  5. "Naturgy cierra un año marcado por la volatilidad del escenario energético contribuyendo a la seguridad de suministro en España". Naturgy. 2023-02-15. Archived from the original on 2024-04-01.