Capella Solar Park
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Capella Solar Park (Parque Solar Capella) is an operating solar farm in Usulután, Departamento de Usulután, El Salvador.
Project Details
Table 1: Phase-level project details for Capella Solar Park
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
Albireo 1 | Operating[1] | 2020[1] | 70 MW[1] | PV[2] | Neoen[1] | Neoen El Salvador[1] |
Albireo 2 | Operating[1] | 2020[1] | 70 MW[1] | PV[2] | Neoen[1] | Neoen El Salvador[1] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Capella Solar Park
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
Albireo 1 | Usulután, Departamento de Usulután, El Salvador[3] | 13.3111, -88.5391 (exact)[3] |
Albireo 2 | Usulután, Departamento de Usulután, El Salvador[3] | 13.3111, -88.5391 (exact)[3] |
The map below shows the exact location of the solar farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 "Neoen Cuts Ribbon On 140-Mw Solar Complex In El Salvador". Renewables Now. Archived from the original on August 27, 2021. Retrieved December 13, 2021.
- ↑ 2.0 2.1 (PDF) https://neoen.com/app/uploads/2020/12/20201204-albireo-el-salvador-mr.pdf. Archived (PDF) from the original on August 15, 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://www.google.com/maps/place/Planta+energetica+solar+Capella/@13.3111195,-88.5390687,1096m/data=!3m2!1e3!4b1!4m5!3m4!1s0x8f7b4731cebb0b29:0x1e372648580d60f0!8m2!3d13.3111195!4d-88.53688.
{{cite web}}
: Missing or empty|title=
(help)