Capiechamartín wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Capiechamartín wind farm is an operating wind farm in Tineo, Asturias, Spain.

Project Details

Table 1: Phase-level project details for Capiechamartín wind farm

Status Commissioning year Nameplate capacity Type Owner Operator
Operating[1] 2021[2] 34 MW[1] Onshore[1] Iberdrola Renovables Energia SA [100%][1] Iberdrola Renovables Energia[2]

Location

Table 2: Phase-level location details for Capiechamartín wind farm

Location Coordinates (WGS 84)
Tineo, Asturias, Asturias, Spain[3] 43.4357, -6.6075 (exact)[3]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240126043539/https://www.iberdrola.com/press-room/news/detail/iberdrola-contributes-economic-development-asturias-with-investments-renewables-support-industry-local-employment-entrepreneurship. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240126150115/https://www.iberdrola.com/press-room/news/detail/iberdrola-places-wind-farms-asturias-into-operation-with-which-triples-renewable-capacity-region. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.google.com/maps/place/Parque+E%C3%B3lico+Capiechamart%C3%ADn/@43.4355508,-6.6097744,550m/data=!3m2!1e3!4b1!4m5!3m4!1s0xd31454257a806ab:0x97ad6a7b5084cf44!8m2!3d43.4355469!4d-6.6075804. {{cite web}}: Missing or empty |title= (help)