Carmonita Norte solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Carmonita Norte solar farm (Planta fotovoltaica Carmonita Norte) is an operating solar photovoltaic (PV) farm in Carmonita, Badajoz, Extremadura, Spain.
Project Details
Table 1: Phase-level project details for Carmonita Norte solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2024[2] | 46 MWp/dc[3] | PV[4] | Fotowatio Renewable Ventures (FRV) BV [100%][5] | Fotowatio Renewable Ventures (FRV)[4] |
2 | Operating[1] | 2024[2] | 46 MWp/dc[3] | PV[4] | Fotowatio Renewable Ventures (FRV) BV [100%][5] | Fotowatio Renewable Ventures (FRV)[4] |
3 | Operating[1] | 2024[2] | 23 MWp/dc[3] | PV[4] | Fotowatio Renewable Ventures (FRV) BV [100%][5] | Fotowatio Renewable Ventures (FRV)[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Carmonita Norte solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Carmonita, Badajoz, Extremadura, Spain[6] | 39.1439, -6.2788 (approximate)[6] |
2 | Carmonita, Badajoz, Extremadura, Spain[6] | 39.1439, -6.2788 (approximate)[6] |
3 | Carmonita, Badajoz, Extremadura, Spain[6] | 39.1439, -6.2788 (approximate)[6] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://grs.energy/grs-begins-work-in-carmonita-norte/ https://frv.com/projects/carmonita-norte-115-mw/, https://grs.energy/grs-begins-work-in-carmonita-norte/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 "Carmonita Norte 115 MW PV Plant". FRV. Archived from the original on 2024-04-01. Retrieved 2024-03-07.
- ↑ 3.0 3.1 3.2 "FRV construirá su nuevo clúster fotovoltaico Carmonita Norte". FRV. 2022-09-22. Archived from the original on 2024-04-12. Retrieved 2024-04-05.
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20240201221732/https://www.pv-magazine.es/2022/09/22/frv-construira-123-mw-en-extremadura-como-parte-de-un-proyecto-de-763-mw/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://frv.com/projects/carmonita-norte-115-mw/ https://www.pv-magazine.es/2022/09/22/frv-construira-123-mw-en-extremadura-como-parte-de-un-proyecto-de-763-mw/, https://frv.com/projects/carmonita-norte-115-mw/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 https://maps.app.goo.gl/yjCWDLj8YMU1dyLH7 https://grs.energy/grs-begins-work-in-carmonita-norte/, https://maps.app.goo.gl/yjCWDLj8YMU1dyLH7.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)