Carvers Creek solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Carvers Creek solar farm is an operating solar photovoltaic (PV) farm in Gloucester County, Virginia, United States.
Project Details
Table 1: Phase-level project details for Carvers Creek solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
CARV | Operating[1] | 2024[1] | 54.9 MWac[2] | PV[2] | Liberty Utilities Co [100%][3] | Liberty Utilities[3] |
CARV2 | Construction[1] | 2025 (planned)[1] | 99 MWac[1] | PV[1] | – | Liberty Utilities[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Carvers Creek solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
CARV | Gloucester County, Virginia, United States[2] | 37.5619, -76.6054 (exact)[2] |
CARV2 | Gloucester County, Virginia, United States[2] | 37.5619, -76.6054 (exact)[2] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 3.0 3.1 3.2 https://solunesco.com/portfolio-items/carvers-creek-solar/.
{{cite web}}
: Missing or empty|title=
(help)