Castillejo 1 solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Castillejo 1 solar farm is a solar photovoltaic (PV) farm in pre-construction in Las Herencias, Toledo, Castilla-La Mancha, Spain.

Project Details

Table 1: Phase-level project details for Castillejo 1 solar farm

Status Nameplate capacity Technology Owner
Pre-construction[1] 31.2 MWp/dc[1] PV[2] Bruc Management[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Castillejo 1 solar farm

Location Coordinates (WGS 84)
Las Herencias, Toledo, Castilla-La Mancha, Spain[3] 39.8689, -4.9208 (approximate)[3]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 "Castilla-La Mancha dio luz verde a más de 3 GW renovables durante el 2023 - Energía Estratégica España - Noticias sobre energías renovables del mercado ibérico". Energía Estratégica. 2023-12-15. Archived from the original on 2024-04-11. Retrieved 2024-04-07.
  2. "Resolución de 14/04/2023, de la Dirección General de Transición Energética, sobre autorización administrativa previa de la instalación solar fotovoltaica denominada Castillejo I, infraestructuras auxiliares y de evacuación (referencia: 2703/01479). [2023/3512]". 2023-04-24. Archived from the original on 2024-04-16. Retrieved 2024-04-15.
  3. 3.0 3.1 https://docm.jccm.es/docm/descargarArchivo.do?ruta=2023/04/24/pdf/2023_3512.pdf&tipo=rutaDocm https://maps.app.goo.gl/RTMYizBUSsHxjLR7A, https://docm.jccm.es/docm/descargarArchivo.do?ruta=2023/04/24/pdf/2023_3512.pdf&tipo=rutaDocm. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)