Castle Gap Solar Hybrid
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Castle Gap Solar Hybrid is an operating solar farm in Upton County, Texas, United States.
Project Details
Table 1: Phase-level project details for Castle Gap Solar Hybrid
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2018[1] | 180 MWac[1] | PV[1] | Vistra CORP[2] | Vistra CORP[1] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Castle Gap Solar Hybrid
Location | Coordinates (WGS 84) |
---|---|
Upton County, Texas, United States[3] | 31.2550, -102.2720 (exact)[1] |
The map below shows the exact location of the solar farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ "Vistra Breaks Ground On 1,000 Mw Of Solar, Storage In Texas". Renewables Now. Archived from the original on October 1, 2020. Retrieved February 14, 2022.
- ↑ "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.