Castle Gap wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Castle Gap wind farm is an operating wind farm in Mills County, Texas, United States.
Project Details
Table 1: Phase-level project details for Castle Gap wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2023[1] | 196.8 MW[1] | Onshore[2] | Swift Current Energy [100%][3] |
Location
Table 2: Phase-level location details for Castle Gap wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Mills County, Texas, United States[1] | 31.3938, -98.3594 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ https://web.archive.org/web/20240125175200/https://swiftcurrentenergy.com/project/castle-gap-wind/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131092610/https://renews.biz/74312/nordex-bags-196mw-texas-order/. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)