Cedar Creek (Summit) wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Cedar Creek (Summit) wind farm is a wind farm in pre-construction in Bringham County, Idaho, United States.

Project Details

Table 1: Phase-level project details for Cedar Creek (Summit) wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner
1 Pre-construction[1] 2024 (planned)[2] 160 MW[3] Onshore[4] Summit Power Group LLC; Western Energy Partners LLC[5]

Location

Table 2: Phase-level location details for Cedar Creek (Summit) wind farm

Phase Name Location Coordinates (WGS 84)
1 Bringham County, Idaho, United States[1] 43.5227, -112.813 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://www.postregister.com/chronicle/news/county-p-z-approve-wind-farm-and-met-tower/article_2f922312-d740-50e1-bcc4-476f3819a961.html. {{cite web}}: Missing or empty |title= (help)
  2. USEia2023
  3. USEia2023
  4. USEia2021ER
  5. https://summitpower.com/projects/wind/. {{cite web}}: Missing or empty |title= (help)