Cedar Point wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Cedar Point wind farm is an operating wind farm in Lincoln County, Colorado, United States.

Project Details

Table 1: Phase-level project details for Cedar Point wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2011[1] 252 MW[1] Onshore[2] Enbridge Inc [100%][3] Enbridge[3]

Location

Table 2: Phase-level location details for Cedar Point wind farm

Phase Name Location Coordinates (WGS 84)
1 Lincoln County, Colorado, United States[1] 39.5113, -103.5701 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  2. ↑ Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.{{cite web}}: CS1 maint: multiple names: authors list (link)
  3. ↑ 3.0 3.1 https://web.archive.org/web/20210703031942/https://www.enbridge.com/stories/2014/october/cedar-point-wind-farm-open-house. Archived from the original on 03 July 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)