Cedar Springs solar farm is a solar farm in pre-construction in Blakely, Early County, Georgia, United States.
Project Details
Table 1: Phase-level project details for Cedar Springs solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2022 (planned)[1] | 70 MWac[1] | PV[1] | Silicon Ranch CORP[2] | Silicon Ranch CORP[1] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Cedar Springs solar farm
Location | Coordinates (WGS 84) |
---|---|
Blakely, Early County, Georgia, United States[3] | 31.2453, -85.0870 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ "Regenerative Energy… More Than Electricity! - Early County News". Early County News. Archived from the original on February 8, 2022. Retrieved February 14, 2022.
- ↑ "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.