Cedar Trail solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Nature Trail Solar Energy Center
Cedar Trail solar farm is an operating solar photovoltaic (PV) farm in Baker County, Florida, United States.
Project Details
Table 1: Phase-level project details for Cedar Trail solar farm
| Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|---|
| Operating[1] | 2024[1] | 74.5 MWac[1] | PV[2] | Florida Power & Light Co [100%][2] | Florida Power & Light[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Cedar Trail solar farm
| Location | Coordinates (WGS 84) |
|---|---|
| Baker County, Florida, United States[1] | 30.3391, -82.1929 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 2.0 2.1 2.2 https://www.fpl.com/project/nature-trail/project-overview.html.
{{cite web}}: Missing or empty|title=(help)
