Çelikler Yumurtalık power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Çelikler Yumurtalık power station (Çelikler Yumurtalık Termik Santrali) is a cancelled power station in Gölovası, Yumurtalık, Adana, Türkiye.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Çelikler Yumurtalık power station Gölovası, Yumurtalık, Adana, Türkiye 36.86788, 35.90949 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 36.86788, 35.90949

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 cancelled coal - bituminous 660 supercritical
Unit 2 cancelled coal - bituminous 660 supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Çelikler Termik Elektrik Üretim [100.0%]
Unit 2 Çelikler Termik Elektrik Üretim [100.0%]

Project-level coal details

  • Coal source(s): imported (Russia, South America, Indonesia, South Africa)

Background

In December 2014, Çelikler Holding announced plans to build a two-unit, $1 billion coal-fired power plant with a total planned capacity of 1,320 MW in Yumurtalık district of Adana Province.[1][2] An environmental permitting public hearing was held in Gölovası in December 2014.[3]

As of December 2018 there had been no further news about this project and it appears to have been cancelled.

Opposition

In December 2014, it was reported that in the village of Gölovasi, Yumurtalik, an environmental impact assessment (EIA) information meeting was held with local people for the Çelikler thermal plant. According to the report, there would be risks such as 26 million tons of coal burned annually and 750 thousand tons of ash. One of the local fisherman, Tahsin Düzengen, expressed deep concerns about the damages to fish and marine life as a result of the thermal plant.[4]

Articles and Resources

References

  1. ÇELİKLER YUMURTALIK TERMİK ENERJİ SANTRALİ: ÇEVRESEL ETKI DEĞERLENDIRMESI BASVURU DOSYASI (Environmental Impact Assessment Application File), EN-ÇEV Enerji Çevre Yatırımları ve Danışmanlığı, 25 Nov. 2014.
  2. Çelikler Enerji Yumurtalık'a Enerji Yatırımı Yapıyor, Yumurtalık Haber, 2 Dec. 2014.
  3. Felaket senaryosu gibi ÇED raporu, Evrensel, 20 Dec. 2014.
  4. “EIA report such as disaster scenario”, Evrensei.net, Translated by Google, December 20, 2014.

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.