Centaurus solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Centaurus solar farm (Planta fotovoltaica Centaurus) is a solar photovoltaic (PV) farm in pre-construction in Alfajarín, Zaragoza, Aragón, Spain.
Project Details
Table 1: Phase-level project details for Centaurus solar farm
| Phase name | Status | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|---|
| 4 | Pre-construction[1] | 83.6 MWac[2] | PV[3] | TotalEnergies SE [100%][3] | Centaurus Environment[4] |
| 5 | Pre-construction[5] | 83.6 MWac[6] | PV[3] | TotalEnergies SE [100%][3] | Centaurus Environment[4] |
| 6 | Pre-construction[7] | 83.6 MWac[8] | PV[3] | TotalEnergies SE [100%][3] | Centaurus Environment[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Centaurus solar farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 4 | Alfajarín, Zaragoza, Aragón, Spain[2] | 41.6253, -0.6988 (approximate)[2] |
| 5 | Villamayor de Gállego, Zaragoza, Aragón, Spain[6] | 41.6786, -0.6895 (approximate)[6] |
| 6 | Perdiguera, Zaragoza, Aragón, Spain[8] | 41.7181, -0.6484 (approximate)[8] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12616 https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12616.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 "BOE-A-2023-12616 Resolución de 20 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Centaurus Environment, SL, la autorización administrativa previa para la instalación fotovoltaica Centaurus IV, de 104,5 MW de potencia pico y 83,6 MW de potencia instalada y su infraestructura de evacuación, en Alfajarín (Zaragoza)". Boletín Oficial del Estado. 2023-05-29. Archived from the original on 2024-03-22. Retrieved 2024-03-20.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 "Cepsa, Iberdrola y Solaria son las empresas que más potencia fotovoltaica presentaron en 2022". Energía Estratégica España. 2023-01-03. Archived from the original on 2024-02-01.
- ↑ 4.0 4.1 4.2 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12617, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12616 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12618, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12617, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12616.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12617 https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12617.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 "BOE-A-2023-12617 Resolución de 20 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Centaurus Environment, SL, la autorización administrativa previa para la instalación fotovoltaica Centaurus V, de 104,5 MW de potencia pico y 83,6 MW de potencia instalada, en Alfajarín (Zaragoza) y su infraestructura de evacuación, situada en Alfajarín y Villamayor de Gállego (Zaragoza)". Boletín Oficial del Estado. 2023-05-29. Archived from the original on 2024-03-22. Retrieved 2024-03-20.
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12618 https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12618.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 8.0 8.1 8.2 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12618.
{{cite web}}: Missing or empty|title=(help)
