Centaurus solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Centaurus solar farm (Planta fotovoltaica Centaurus) is a solar photovoltaic (PV) farm in pre-construction in Alfajarín, Zaragoza, Aragón, Spain.

Project Details

Table 1: Phase-level project details for Centaurus solar farm

Phase name Status Nameplate capacity Technology Owner Operator
4 Pre-construction[1] 83.6 MWac[2] PV[3] TotalEnergies SE [100%][3] Centaurus Environment[4]
5 Pre-construction[5] 83.6 MWac[6] PV[3] TotalEnergies SE [100%][3] Centaurus Environment[4]
6 Pre-construction[7] 83.6 MWac[8] PV[3] TotalEnergies SE [100%][3] Centaurus Environment[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Centaurus solar farm

Phase Name Location Coordinates (WGS 84)
4 Alfajarín, Zaragoza, Aragón, Spain[2] 41.6253, -0.6988 (approximate)[2]
5 Villamayor de Gállego, Zaragoza, Aragón, Spain[6] 41.6786, -0.6895 (approximate)[6]
6 Perdiguera, Zaragoza, Aragón, Spain[8] 41.7181, -0.6484 (approximate)[8]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12616 https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12616. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 "BOE-A-2023-12616 Resolución de 20 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Centaurus Environment, SL, la autorización administrativa previa para la instalación fotovoltaica Centaurus IV, de 104,5 MW de potencia pico y 83,6 MW de potencia instalada y su infraestructura de evacuación, en Alfajarín (Zaragoza)". Boletín Oficial del Estado. 2023-05-29. Archived from the original on 2024-03-22. Retrieved 2024-03-20.
  3. ↑ 3.0 3.1 3.2 3.3 3.4 3.5 "Cepsa, Iberdrola y Solaria son las empresas que más potencia fotovoltaica presentaron en 2022". Energía Estratégica España. 2023-01-03. Archived from the original on 2024-02-01.
  4. ↑ 4.0 4.1 4.2 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12617, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12616 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12618, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12617, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12616. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12617 https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12617. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. ↑ 6.0 6.1 6.2 "BOE-A-2023-12617 Resolución de 20 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Centaurus Environment, SL, la autorización administrativa previa para la instalación fotovoltaica Centaurus V, de 104,5 MW de potencia pico y 83,6 MW de potencia instalada, en Alfajarín (Zaragoza) y su infraestructura de evacuación, situada en Alfajarín y Villamayor de Gállego (Zaragoza)". Boletín Oficial del Estado. 2023-05-29. Archived from the original on 2024-03-22. Retrieved 2024-03-20.
  7. ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12618 https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12618. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  8. ↑ 8.0 8.1 8.2 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12618. {{cite web}}: Missing or empty |title= (help)