Centinela Solar Energy
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Centinela Solar Energy CSE5
Centinela Solar Energy is an operating solar photovoltaic (PV) farm in Imperial County, California, United States.
Project Details
Table 1: Phase-level project details for Centinela Solar Energy
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2013[1] | 34 MWac[1] | PV[1] | LS Power[2] | LS Power[2] |
2 | Operating[1] | 2013[1] | 27 MWac[1] | PV[1] | LS Power[2] | LS Power[2] |
3 | Operating[1] | 2013[1] | 34 MWac[1] | PV[1] | LS Power[2] | LS Power[2] |
4 | Operating[1] | 2013[1] | 34 MWac[1] | PV[1] | LS Power[2] | LS Power[2] |
5 | Operating[3] | 2014[3] | 19 MWac[3] | PV[3] | LS Power[2] | Arevon Energy, Inc.[4] |
6 | Operating[1] | 2014[1] | 27 MWac[1] | PV[1] | LS Power[2] | LS Power[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Centinela Solar Energy
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Imperial County, California, United States[4] | 32.6869, -115.6478 (exact)[1] |
2 | Imperial County, California, United States[4] | 32.6869, -115.6478 (exact)[1] |
3 | Imperial County, California, United States[4] | 32.6869, -115.6478 (exact)[1] |
4 | Imperial County, California, United States[4] | 32.6869, -115.6478 (exact)[1] |
5 | Calexico, Imperial County, California, United States[4][3] | 32.6869, -115.6480 (exact)[3] |
6 | Imperial County, California, United States[4] | 32.6869, -115.6478 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 https://www.lspower.com/ls-power-completes-financing-centinela-solar-energy/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. July 2022. Archived from the original on July 12, 2022. Retrieved July 5, 2022.
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. 2023. Retrieved September 29, 2023.
{{cite web}}
: CS1 maint: url-status (link)