CCC Norte-III power station (Central CC Norte III) is an operating power station of at least 906-megawatts (MW) in Ciudad Juárez, Chihuahua, Mexico. It is also known as Abeinsa Juárez N-III.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
CCC Norte-III power station | Ciudad Juárez, Chihuahua, Mexico | 31.473111, -106.4705358 (approximate)[1][2] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 1 | operating[3] | fossil gas - natural gas[4] | 453[3][4][5] | combined cycle[3][4] | – | 2020[6][7][4] | – |
Unit 2 | operating[3] | fossil gas - natural gas[4] | 453[3][4][5] | combined cycle[3][4] | – | 2020[6][7][4] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Abeinsa Juárez N-III SA de CV [100%] | Macquarie Group Ltd [45.5%]; InfraRed [35.5%]; Invex Infraestructura [10.0%]; Techint SA de CV [9.0%] |
Unit 2 | Abeinsa Juárez N-III SA de CV [100%] | Macquarie Group Ltd [45.5%]; InfraRed [35.5%]; Invex Infraestructura [10.0%]; Techint SA de CV [9.0%] |
Background
The project was awarded a bridge loan on which it ultimately defaulted when the parent company Abengoa struggled financially and underwent an insolvency process in Spain.[8] Accordingly, the project was suspended as restructuring or potential sales were considered.[8] Carl Marks Advisors (CMA) determined the sale of Norte III would maximize value and moved forward with the process.[8] A joint bid from Macquarie Group and Techint Engineering & Construction was chosen as the most viable path for Norte III to reach commercial operations in 2017.[8] In March 2018, Macquarie Group sold 45.5% of their total equity interest in Norte III to InfraRed (35.5%) and Invex (10%).[9]
In June 2020, construction of the Norte III combined cycle power plant by Techint Engineering & Construction-Macquarie Capital consortium was completed and commercial operations had begun.[10][11]
Natural gas is supplied to the Norte III plant via the San Isidro-Samalayuca pipeline.[12]
Articles and Resources
References
- ↑ https://goo.gl/maps/hu7g8qbDxVDYsVnUA.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125141447/https://www.google.com/maps/place/Ccc+Norte+lll/@31.4731747,-106.4716718,168m/data=!3m1!1e3!4m6!3m5!1s0x86e763a9cbf84ffd:0x1b1b515e6a9116c9!8m2!3d31.4730596!4d-106.4705376!16s%2Fg%2F11f6fzjlq9?entry=tts. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 (PDF) https://web.archive.org/web/20240125141014/https://www.cfe.mx/finanzas/reportes-financieros/Informe%20Anual%20Documentos/Informe%20Anual%20Portal.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://web.archive.org/web/20240125093631/https://gnenergia.com/Proyecto-Norte/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240125122843/https://gnenergia.com/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20240125115627/https://www.proyectosmexico.gob.mx/proyecto_inversion/222-ciclo-combinado-norte-iii-juarez/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20240125115625/https://www.milenio.com/negocios/electric-planta-ciclo-combinado-norte-iii-inicia-ventas. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 "Two-Pronged Sale Process for Power Plant Project – Carl Marks Advisors". www.carlmarksadvisors.com. Retrieved 2021-06-23.
- ↑ "Macquarie Capital sells 45.5% stake in power plant under construction in Ciudad Juarez - MEXICONOW". MEXICONOW. 2018-03-20. Retrieved 2021-06-23.
- ↑ "Norte III launches commercial operations". Techint. June 15, 2020.
- ↑ "Planta de ciclo combinado Norte III inició operaciones comerciales: GE". Milenio. June 18, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "0765 CFE: Gasoducto San Isidro – Samalayuca". Proyectos México. Retrieved 2021-04-06.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.