Arroyo Seco Dreyfus power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Arroyo Seco Dreyfus power station (Central Térmica Arroyo Seco Dreyfus) is a power station under construction in General Lagos, Santa Fe, Argentina.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Arroyo Seco Dreyfus power station | General Lagos, Santa Fe, Argentina | -33.1215, -60.5232 (approximate)[1][2] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit TG1 | construction[3][4] | gas[4] | 54 MW[4][2] | gas turbine[5][4][2] | yes[5][6] | - | - |
Unit TG2 | construction[3][4] | gas[4] | 54 MW[4][2] | gas turbine[5][4][2] | yes[5][6] | - | - |
Unit TV1 | construction[3][4] | gas[4] | 25 MW[4][2] | steam turbine[4][2] | yes[5][6] | - | - |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Operator | Owner | Parent |
---|---|---|---|
Unit TG1 | Grupo Albanesi[6][4][2] | Grupo Albanesi | Grupo Albanesi |
Unit TG2 | Grupo Albanesi[6][4][2] | Grupo Albanesi | Grupo Albanesi |
Unit TV1 | Grupo Albanesi[6][4][2] | Grupo Albanesi | Grupo Albanesi |
Financing
Financing
Background
Arroyo Seco Dreyfus power station will be built using two SFT800 Siemens gas turbines based on an August 2017 contract.[7] The loan for construction, implementation, and operation of the plant was approved on April 4, 2018.[7] In May 2018, the plant was valued at $225 million.[8] In October 2019, Albanesi gave a New Date for the Commercial Authorization Committed (NFHCC) as July 11, 2022.[9] In January 2021, Grupo Albanesi announced a $600 million USD investment in Arroyo Seco.[10]
In November 2022, the project was not listed on Grupo Albanesi's "News and New Projects" webpage.[11] Progress on plant construction has been stalled since 2018, with lack of financing cited as a contributing factor.[12]
Articles and Resources
References
- ↑ 1.0 1.1 https://goo.gl/maps/APg1Z2z1CAFR9xb88.
{{cite web}}
: Missing or empty|title=
(help) Cite error: Invalid<ref>
tag; name "ref_0" defined multiple times with different content - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 https://web.archive.org/web/20220809114443/https://desarrolloenergetico.com.ar/buscan-financiar-las-obras-de-una-central-termica/. Archived from the original on 2022-08-09.
{{cite web}}
: Missing or empty|title=
(help) Cite error: Invalid<ref>
tag; name "ref_1" defined multiple times with different content - ↑ 3.0 3.1 3.2 https://www.albanesi.com.ar/relacion-docs.php?id=838&fl=inv-838-e053b7d571f81416f21b6eca7b064de6-2.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 (PDF) https://content-us-7.content-cms.com/8ba19f21-9a97-4525-8886-f54d823a5cea/dxresources/32e2/32e2c439-f9be-4407-8d67-84bb3805fd25.pdf.
{{cite web}}
: Missing or empty|title=
(help) Cite error: Invalid<ref>
tag; name "ref_3" defined multiple times with different content Cite error: Invalid<ref>
tag; name "ref_3" defined multiple times with different content - ↑ 5.0 5.1 5.2 5.3 5.4 "MHPS anuncia sua primeira vitória em leilão brasileiro de turbina a gás JAC". Albanesi. February 14, 2018. Archived from the original on May 5, 2021. Retrieved May 6, 2021.
- ↑ 6.0 6.1 6.2 6.3 6.4 6.5 "El Grupo Albanesi pone en venta uno de sus proyectos energéticos". iProfesional. Archived from the original on May 3, 2021. Retrieved May 4, 2021.
- ↑ 7.0 7.1 "Consolidated Financial Statements". Albanesi SA. December 31, 2018.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Arroyo Seco and Timbúes CHPs, Argentina | Case Studies | IJGlobal". ijglobal.com. Retrieved 2021-06-24.
- ↑ "Consolidated Financial Statements 2019". Albanesi. December 31, 2019.
{{cite web}}
: CS1 maint: url-status (link) - ↑ VIVO247.com (2021-01-23). "Grupo Albanesi invierte US$ 600 millones en Arroyo Seco". VIVO247.com. Retrieved 2021-11-02.
- ↑ "News and new projects". Grupo Albanesi. November 2022. Retrieved 29 November 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Dobry, Hernán (11 July 2022). "Buscan financiar las obras de una central térmica". Desarrollo Energético. Retrieved 29 November 2022.
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.