30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Centurión solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Centurión solar farm (Planta solar fotovoltaica Centurión) is an operating solar photovoltaic (PV) farm in Segura de León, Badajoz, Extremadura, Spain.

Project Details

Table 1: Phase-level project details for Centurión solar farm

Status Nameplate capacity Technology Owner
Operating[1] 116.5 MWac[2] PV[3] Enel Green Power España SL [100%][2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Centurión solar farm

Location Coordinates (WGS 84)
Segura de León, Badajoz, Extremadura, Spain[4] 38.1365, -6.5145 (approximate)[4]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240126042920/https://www.enelgreenpower.com/countries/europe/spain. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 "BOE-A-2023-11003 Resolución de 20 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Enel Green Power España, SL, la autorización administrativa previa y la autorización administrativa de construcción para la instalación fotovoltaica "Centurión" de 116,5 MW de potencia instalada". Boletín Oficial del Estado. 2023-05-08. Archived from the original on 2024-04-01. Retrieved 2024-03-07.
  3. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-15870 https://www.pv-magazine.es/2022/09/30/aprobada-la-declaracion-ambiental-para-la-planta-solar-centurion-de-15495-mwp-en-la-provincia-de-badajoz/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-15870. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. 4.0 4.1 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-15870 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-11003, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-15870. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)