Chandalash hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Chandalash hydroelectric plant is a hydroelectric power plant in pre-construction in Ala-Buka District, Jalal-Abad Region, Kyrgyzstan.

Project Details

Table 1: Project details for Chandalash hydroelectric plant

Status Commissioning year Nameplate capacity Owner
Pre-construction[1] 2027 (planned)[2] 30 MW[1] Rosatom Nedra JSC (АО "РОСАТОМ НЕДРА")[1]

Location

Table 2: Location details for Chandalash hydroelectric plant

Location River Coordinates (WGS 84)
Ala-Buka District, Jalal-Abad Region, Kyrgyzstan[2] Chandalash River[3] 41.4087, 71.4759 (approximate)[2]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://tadviser.com/index.php/Company:Chandalash_(HPP). {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://rivershelp.org/n/995. {{cite web}}: Missing or empty |title= (help)
  3. https://russia-islworld.ru/en/temy/rosatom-to-launch-first-small-hydropower-plant-in-kyrgyzstan-by-2025-2024-03-25-40360/. {{cite web}}: Missing or empty |title= (help)