Changchun-2 power station (大唐长春第二热电厂, 大唐长春二热退城进郊2×660MW煤电项目) is an operating power station of at least 1320-megawatts (MW) in 6898 E Huancheng Rd, Erdao, Changchun, Jilin, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Changchun-2 power station | 6898 E Huancheng Rd, Erdao, Changchun, Jilin, China | 43.8844174, 125.393611 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4, Unit 5, Unit 6: 43.8844174, 125.393611
- Unit R1, Unit R2: 44.132162, 125.439899
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Unit 1 | Operating | coal: bituminous[1] | 220 | subcritical | yes | 1991 | False |
| Unit 2 | Operating | coal: bituminous[1] | 220 | subcritical | yes | 1992 | False |
| Unit 3 | Operating | coal: bituminous[1] | 220 | subcritical | yes | 2005 | False |
| Unit 4 | Operating | coal: bituminous[1] | 220 | subcritical | yes | 2005 | False |
| Unit 5 | Operating | coal: bituminous[1] | 220 | subcritical | yes | 2007 | False |
| Unit 6 | Operating | coal: bituminous[1] | 220 | subcritical | yes | 2007 | False |
| Unit R1 | Construction[2][3] | coal: unknown[1][3] | 660[3] | ultra-supercritical[3] | yes | 2027 (planned)[3] | False |
| Unit R2 | Construction[2][3] | coal: unknown[1][3] | 660[3] | ultra-supercritical[3] | yes | 2027 (planned)[3] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Datang Changchun No.2 Thermal Power Co Ltd [100%] | Changchun Erdao Industrial Development Co Ltd [46.6%]; China Datang Corp Ltd [46.6%]; unknown [6.8%] |
| Unit 2 | Datang Changchun No.2 Thermal Power Co Ltd [100%] | Changchun Erdao Industrial Development Co Ltd [46.6%]; China Datang Corp Ltd [46.6%]; unknown [6.8%] |
| Unit 3 | Datang Changchun No.2 Thermal Power Co Ltd [100%] | Changchun Erdao Industrial Development Co Ltd [46.6%]; China Datang Corp Ltd [46.6%]; unknown [6.8%] |
| Unit 4 | Datang Changchun No.2 Thermal Power Co Ltd [100%] | Changchun Erdao Industrial Development Co Ltd [46.6%]; China Datang Corp Ltd [46.6%]; unknown [6.8%] |
| Unit 5 | Datang Changchun No.2 Thermal Power Co Ltd [100%] | Changchun Erdao Industrial Development Co Ltd [46.6%]; China Datang Corp Ltd [46.6%]; unknown [6.8%] |
| Unit 6 | Datang Changchun No.2 Thermal Power Co Ltd [100%] | Changchun Erdao Industrial Development Co Ltd [46.6%]; China Datang Corp Ltd [46.6%]; unknown [6.8%] |
| Unit R1 | Datang Changchun No.2 Thermal Power Co Ltd [100%] | Changchun Erdao Industrial Development Co Ltd [46.6%]; China Datang Corp Ltd [46.6%]; unknown [6.8%] |
| Unit R2 | Datang Changchun No.2 Thermal Power Co Ltd [100%] | Changchun Erdao Industrial Development Co Ltd [46.6%]; China Datang Corp Ltd [46.6%]; unknown [6.8%] |
Project-level coal details
- Coal source(s): domestic
- Permit(s): 吉发改审批【2025】3号[4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The first two units of the plant were built in 1991 and 1992, with the newer four units built adjacent to the first ones in 2005-2007, as shown on Google Earth time machine.[5] The plant is a combined heating and power unit, providing heat to heating an area of about 31 million square meters.[6]
The 2×660 MW “retreat from city to suburb” project was announced in March 2024.[7] Provincial approval (Ji Fa Gai Shen Pi〔2025〕No.3) was granted by April 2025, and the EIA was submitted in April 2025.[8] The first concrete was poured on 8 September 2025, and Unit 1 boiler steel erection began in August 2025.[9] By May 2026, the first boiler beam was hoisted. Unit 1 is under construction.
Unit 2 boiler’s first steel frame was hoisted on 15 November 2025.[10]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://news.bjx.com.cn/html/20250911/1460394.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 https://news.bjx.com.cn/html/20240313/1365778.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ https://news.bjx.com.cn/html/20250423/1438225.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "List of major power stations in Jilin province," Wikipedia, accessed September 2016
- ↑ 大唐长春第二热电有限责任公司 China Datang
- ↑ "大唐长春二热退城进郊2×660MW煤电项目". 微信公众号. 2024-03-13. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐长春二热退城进郊项目环境影响报告书" (PDF). 吉林省生态环境厅. 2025-04-18. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "长春二热项目第一罐混凝土浇筑". 微信公众号. 2025-09-08. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐长春二热2号锅炉首根钢架吊装". 微信公众号. 2025-11-15. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.