Other names: Changhua General Energy Pv 2
Changhua General Energy solar farm is a cancelled solar farm in Changhua County, Taiwan.
Project Details
Table 1: Phase-level project details for Changhua General Energy solar farm
Phase name | Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
2 | Cancelled (inferred July 2021) | 40 MW[1] | PV | Taishin International Commercial Bank; DBS Bank (台新國際商業銀行; 星展銀行)[2] | Aeon Energy CO LTD; Yongyao Energy CO LTD (永旺能源; 永堯能源)[3] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Changhua General Energy solar farm
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
2 | Changhua County, Taiwan[2] | 24.0756, 120.5445 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ "Ges To Build 40 Mw Solar Project In Taiwan". Photon. Archived from the original on July 22, 2021. Retrieved December 13, 2021.
- ↑ 2.0 2.1 2.2 "Nsp Building 40Mw Solar Power Plant In Taiwan". PV Tech. October 3, 2017. Archived from the original on July 23, 2021. Retrieved December 13, 2021.
- ↑ "Neo Solar To Build Solar-Power Farm In Changhua County". Taipei Times. October 4, 2017. Archived from the original on July 23, 2021. Retrieved December 13, 2021.