Changle Shengshi power station (昌乐盛世热电公司) is a 120-megawatt (MW) coal-fired power station in Shandong province, China.

Location

The undated satellite photo below shows the plant at 224 Provincial Road in Changle.

Loading map...

Background on Plant

Changle Shengshi power station is a 4 x 30 MW coal-fired power station in Changle county, Weifang prefecture. For building the last two units without permits, the government fined the company 7.1 million RMB ($1 million), and told the plant owners to go through the permission process and apply for all the permission documents needed.[1][2]

Project Details of expansion

  • Sponsor: Changle Shengshi Thermal Power Co
  • Parent company: Shandong Shiji Yangguang Paper Group, Weifang Shengtai Pharmaceutical Company
  • Location: 224 Provincial Road, Changle county, Weifang prefecture, Shandong province, China
  • Coordinates: 36.739314, 118.851756 (exact)
  • Status: Operating
  • Gross capacity: 120 MW (Units 5-8: 30 MW)
  • Start year: 2009 (Unit 5), 2010 (Unit 6), Unclear (Units 7-8)
  • Type: Subcritical
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and resources

References

  1. "关于受理昌乐盛世热电有限责任公司2*B30MW热电联产机组扩建项目," China TPG, Dec 21, 2018
  2. "世纪阳光"AB面":全国造纸15强资产过百亿 股东及子公司屡被处罚". dzrb.dzng.com. 2020-12-16. Retrieved 2020-12-21.