Chaozhou LNG Terminal (Huafeng)
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Chaozhou LNG Terminal (Huafeng), also known as 华丰潮州LNG储配站, 潮州闽粤经济合作区LNG储配站, and 华丰中天潮州LNG储配站, is an LNG import terminal in China with units that are shelved (inferred 2 y) and shelved (confirmed).
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Expansion | SuochengTown, Chaozhou, Guangdong, China[1] | 23.576582, 117.122439 (exact) |
| Phase 1 | Dacheng, Chaozhou, Guangdong, China[1] | 23.576582, 117.122439 (exact) |
The map below shows the exact location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Expansion | import[1] | shelved (inferred 2 y) | 2 mtpa[1] | 3.0 mtpa | False | From Canada; https://finance.sina.cn/futuremarket/qszx/2020-11-26/detail-iiznezxs3858695.d.html?cre=wappage&mod=r&loc=4&r=0&rfunc=26&tj=wap_news_relate |
| Phase 1 | import[2] | shelved (confirmed)[3] | 1 mtpa[2] | 3.0 mtpa | False | From Canada; https://finance.sina.cn/futuremarket/qszx/2020-11-26/detail-iiznezxs3858695.d.html?cre=wappage&mod=r&loc=4&r=0&rfunc=26&tj=wap_news_relate |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Expansion | import[1] | US$320,000,000 (2,000,000,000 RMB)[4] | US$752,000,000 |
| Phase 1 | import[2] | US$432,000,000 (2,700,000,000 RMB)[5] | US$752,000,000 |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Expansion | import[1] | shelved (inferred 2 y) | 2019[4] | – | – | – | 2021 (shelved) |
| Phase 1 | import[2] | shelved (confirmed)[3] | – | – | 2016[6][7] | –[8][8] | 2024 (shelved)[3] |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Expansion | import[1] | shelved (inferred 2 y) | Guangdong Huafeng Suntien LNG Co Ltd [100%][9] | Zhongxing Tianheng Energy Technology (Beijing) Co Ltd [55.0%]; Chaozhou Huafeng Group Co Ltd [44.7%]; other [0.3%] | – |
| Phase 1 | import[2] | shelved (confirmed)[3] | Guangdong Huafeng Suntien LNG Co Ltd [100%][9] | Zhongxing Tianheng Energy Technology (Beijing) Co Ltd [55.0%]; Chaozhou Huafeng Group Co Ltd [44.7%]; other [0.3%] | – |
Background
Chaozhou LNG Terminal (华丰中天潮州LNG储配站, 潮州闽粤经济合作区LNG储配站) is an LNG terminal under construction in Chaozhou, Guangdong, China.
April 28, 2016, the project was approved by the former Raoping County Environmental Protection Bureau.[10]
The two storage tanks were completed in July 2018. The sponsor and operator is a joint venture Guangdong Huafeng Zhongtian LNG Co., Ltd. (广东华丰中天液化天然气有限公司), owned by Sinoenergy (55%) and Huafeng Group (45%).[11]
The supporting gas pipeline which will transport the natural gas from the LNG terminal to eastern Guangdong and Pearl River Delta region began construction in June 2020. It will share the pipeline with nearby Huaying Chaozhou LNG Terminal.[12] The upgrade of the supporting port has been approved by the local authority.[13]
The project is seeking the environmental impact assessment approval again in 2022 due to significant changes of the project. It will add gasification facilities on the site comparing to the original plan of LNG tank wagon transportation only.[14]
As of January 30, 2022, the onshore works of Phase 1 were nearly completed, and jetty construction began.[15]
As of December 8, 2025, the project is still under construction and not yet operational.[16]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.huafeng.cn/LNGcn/index_157.aspx.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 http://www.raoping.gov.cn/zwgk/zdlyxxgk/shgysyjsly/hjbhly/content/post_3805317.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 (PDF) https://file.finance.sina.com.cn/211.154.219.97:9494/MRGG/SBGG/2024/2024-3/2024-03-14/9870962.PDF.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://gas.in-en.com/html/gas-3139494.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.chaozhou.gov.cn/ywdt/czyw/content/post_3676833.html.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.sohu.com/a/214158437_463997.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) http://img3.gelonghui.com/pdf201609/pdf20160913100223806.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 https://www.raoping.gov.cn/zwgk/zfqzqd/gsgg/content/post_3805319.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 https://www.qcc.com/firm/18b6118cf3d72cb3553d39a35afdcfac.html.
{{cite web}}: Missing or empty|title=(help) - ↑ "潮州市生态环境局饶平分局拟对潮州闽粤经济合作区LNG储配站(一期)重新报批项目环境影响报告表进行审批的公示". 2022-07-07. Retrieved 2026-03-18.
{{cite web}}: CS1 maint: url-status (link) - ↑ “潮州闽粤经济合作区LNG储配站”项目2号储罐顺 Source: 中天官网中天能源(SH600856) 07-27-2018
- ↑ 广东省天然气管网华丰LNG储配站和华瀛LNG接收站配套外输管线项目正式开工 Source:广东能源集团, 06-04-2020.
- ↑ 华丰中天LNG储配站项目配套码头工程使用港口岸线获批 Source: 同花顺财经, 07-18-2019
- ↑ 潮州市生态环境局饶平分局拟对潮州闽粤经济合作区LNG储配站(一期)重新报批项目环境影响报告表进行审批的公示 source: Raoping government,饶平县人民政府 2022-07-07
- ↑ "潮州闽粤经济合作区LNG储配站建设项目陆域工程已接近完成!". 2022-01-30. Retrieved 2026-03-18.
{{cite web}}: CS1 maint: url-status (link) - ↑ "粤东天然气主干管网华丰LNG储配站和华瀛LNG接收站配套外输管线项目公示材料". 2025-12-08. Retrieved 2026-03-18.
{{cite web}}: CS1 maint: url-status (link)