Chaozhou Sanbaimen power station (大唐潮州三百门发电厂) is an operating power station of at least 3260-megawatts (MW) in Zhelin, Raoping, Chaozhou, Guangdong, China with multiple units, some of which are not currently operating. It is also known as 大唐潮州电厂 (Phase III Unit 5, Phase III Unit 6).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Chaozhou Sanbaimen power station Zhelin, Raoping, Chaozhou, Guangdong, China 23.56645, 117.0972 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 23.56645, 117.0972

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Phase I Unit 1 Operating coal: bituminous[2] 630 supercritical 2006 False
Phase I Unit 2 Operating coal: bituminous[2] 630 supercritical 2006 False
Phase II Unit 3 Operating coal: bituminous[2] 1000 ultra-supercritical 2009 False
Phase II Unit 4 Operating coal: bituminous[2] 1000 ultra-supercritical 2010 False
Phase III Unit 5 Construction[3] coal: unknown[2][1] 1000[1] ultra-supercritical[1] 2026 (planned)[3] False
Phase III Unit 6 Construction[3] coal: unknown[2][1] 1000[1] ultra-supercritical[1] 2026 (planned)[3] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Guangdongdatanginternationalchaozhoupower Co Ltd [100%][1] Datang International Power Generation Co Ltd [52.5%]; China Datang Corp Ltd [42.5%]; Chaozhou Xinghua Energy Sources Investment Co Ltd [5.0%]
Phase I Unit 2 Guangdongdatanginternationalchaozhoupower Co Ltd [100%][1] Datang International Power Generation Co Ltd [52.5%]; China Datang Corp Ltd [42.5%]; Chaozhou Xinghua Energy Sources Investment Co Ltd [5.0%]
Phase II Unit 3 Guangdongdatanginternationalchaozhoupower Co Ltd [100%][1] Datang International Power Generation Co Ltd [52.5%]; China Datang Corp Ltd [42.5%]; Chaozhou Xinghua Energy Sources Investment Co Ltd [5.0%]
Phase II Unit 4 Guangdongdatanginternationalchaozhoupower Co Ltd [100%][1] Datang International Power Generation Co Ltd [52.5%]; China Datang Corp Ltd [42.5%]; Chaozhou Xinghua Energy Sources Investment Co Ltd [5.0%]
Phase III Unit 5 Guangdongdatanginternationalchaozhoupower Co Ltd [100%][1] Datang International Power Generation Co Ltd [52.5%]; China Datang Corp Ltd [42.5%]; Chaozhou Xinghua Energy Sources Investment Co Ltd [5.0%]
Phase III Unit 6 Guangdongdatanginternationalchaozhoupower Co Ltd [100%][1] Datang International Power Generation Co Ltd [52.5%]; China Datang Corp Ltd [42.5%]; Chaozhou Xinghua Energy Sources Investment Co Ltd [5.0%]

Project-level coal details

  • Coal source(s): domestic/imported
  • Permit(s): 粤发改核准〔2023〕8号[4]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Chaozhou Sanbaimen power station is a four-unit coal-fired power plant with a total capacity of 3,200 MW in Guangdong Province. The first two units, totaling 1,200 MW, were completed in 2006. Units 3 & 4, totaling 2,000 MW, were completed in 2009-2010. The plant is owned by China Datang.[5][6][7]

In December 2022, plans for a 2 x 1,000 MW expansion at the plant were announced in the Guangdong provincial 14th Five Year Plan and the permission to build was granted on 13 April 2023 (Yue Fa Gai He Zhun〔2023〕No.8)[8]. Environmental Impact Assessment (EIA) report[9] and land use[10] have been approved by the local government.

The 2×1000 MW expansion held an opening ceremony in June 2023 and received EIA approval in 2023.[11] Major equipment tenders were issued in 2024‑2025. First concrete was poured on 28 September 2024, marking the official start of construction.[12] Unit 5 boiler steel was erected in December 2024, and by June 2026 the chemical water system was producing desalinated water. Unit 5 is under construction.

Unit 6 boiler foundation was 80% complete by December 2024.

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 "广东省生态环境厅关于大唐潮州电厂5-6号机组项目环境影响报告书的批复". 广东省生态环境厅网站. 2023-04-18. Archived from the original on 2025-05-05. Retrieved 2025-09-24.
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 https://news.bjx.com.cn/html/20240929/1403140.shtml. {{cite web}}: Missing or empty |title= (help)
  4. ↑ "广东省发展改革委关于大唐潮州电厂5-6号机组项目核准的批复". drc.gd.gov.cn. 2023-04-13. Archived from the original on 2024-01-25. Retrieved 2023-10-17.
  5. ↑ "Coal-Fired Plants in China - Guangdong," Power Plants Around the World, November 2014.
  6. ↑ "Sanbaimeng Power Station," Wikimapia, accessed November 2014
  7. ↑ "广东大唐潮州三百门3、4号机组通过核准"NEA, 2010-8-16
  8. ↑ "广东省发展改革委关于大唐潮州电厂5-6号机组项目核准的批复". 广东省发展和改革委员会. 2023-04-13.{{cite web}}: CS1 maint: url-status (link)
  9. ↑ "广东省生态环境厅关于大唐潮州电厂5-6号机组项目环境影响报告书的批复". 广东省生态环境厅. 2023-04-06.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "潮州市饶平县预留城乡建设用地规模使用审批表(大唐潮州电厂5-6号机组项目划留用地)的公告". 饶平县自然资源局. 2023-05-10.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "大唐潮州发电公司5-6号机组工程项目举行开工仪式". 饶平县人民政府. 2023-06-29. Retrieved 2026-06-12.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "大唐潮州电厂5-6号机组项目浇筑首灌混凝土". 北极星电力网. 2024-09-29. Retrieved 2026-06-12.{{cite web}}: CS1 maint: url-status (link)

Additional data