Chapel Lane Parley solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Chapel Lane Parley Solar Farm Phase 3

Chapel Lane Parley solar farm is an operating solar photovoltaic (PV) farm in Bournemouth, South West, England, United Kingdom.

Project Details

Table 1: Phase-level project details for Chapel Lane Parley solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Operating[1] 2014[1] 20 MW[1] PV[2] Solar Power Generation LTD[1]
2 Operating[1] 2014[1] 36 MW[1] PV[3] Eco Sustainable Solutions LTD[1]
3 Operating[4] 2015[5] 4 MW[6] PV[7]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Chapel Lane Parley solar farm

Phase Name Location Coordinates (WGS 84)
1 Bournemouth, South West, England, United Kingdom[1] 50.7918, -1.8612 (exact)[1]
2 Bournemouth, South West, England, United Kingdom[1] 50.7959, -1.8563 (exact)[1]
3 Dorset, South West, England, United Kingdom[8] 50.8032, -1.8644 (exact)[9]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 "Renewable Energy Planning Database". United Kingdom Government. March, 2021. Retrieved May 24, 2021. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  2. UKGov2022
  3. UKGov2022
  4. UKGov2022
  5. UKGov2022
  6. UKGov2022
  7. UKGov2022
  8. UKGov2022
  9. UKGov2022