Chattanooga Metropolitan Airport Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Chattanooga Metropolitan Airport Solar GEN2 (Phase 2), Chattanooga Metropolitan Airport Solar GEN1 (Phase 1)
Chattanooga Metropolitan Airport Solar is an operating solar photovoltaic (PV) farm in Chattanooga, Hamilton County, Tennessee, United States.
Project Details
Table 1: Phase-level project details for Chattanooga Metropolitan Airport Solar
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Operator |
---|---|---|---|---|---|
1 | Operating[1] | 2013[1] | 1 MWac[1] | PV[2] | Chattanooga Metropolitan Airport[2] |
2 | Operating[1] | 2013[1] | 1 MWac[1] | PV[2] | Chattanooga Metropolitan Airport[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Chattanooga Metropolitan Airport Solar
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Chattanooga, Hamilton County, Tennessee, United States[2] | 35.0246, -85.2086 (exact)[2] |
2 | Chattanooga, Hamilton County, Tennessee, United States[2] | 35.0246, -85.2086 (exact)[2] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help)