Chayanta hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Chayanta hydroelectric plant (Central Hidroeléctrica Chayanta) is a cancelled hydroelectric power plant in Potosí, Bolivia.
Project Details
Table 1: Project details for Chayanta hydroelectric plant
| Status | Nameplate capacity | Owner | Operator |
|---|---|---|---|
| Cancelled[1] | 177 MW[1] | Empresa Nacional de Electricidad Corp [100%] (ENDE Corporación)[1] | ENDE Valle Hermoso[1] |
Location
Table 2: Location details for Chayanta hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Potosí, Bolivia[1] | Chayanta River[1] | -19.025, -65.7035 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
