Chelveston Renewable Energy Park solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Chelveston Renewable Energy Park solar farm is an operating solar farm in North Northamptonshire, East Midlands, England, United Kingdom.
Project Details
Table 1: Phase-level project details for Chelveston Renewable Energy Park solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2015[1] | 60 MW[2] | PV[3] | Wykes Engineering LTD[4] |
2 | Operating[3] | 2015[3] | 20 MW[3] | PV[3] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Chelveston Renewable Energy Park solar farm
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
1 | North Northamptonshire, East Midlands, England, United Kingdom[4] | 52.2976, -0.5367 (exact)[4] |
2 | Northamptonshire, East Midlands, England, United Kingdom[3] | 52.3041, -0.5286 (exact)[3] |
The map below shows the exact locations of the solar farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "Grid Connected Solar Generation". Chelveston Renewable Energy. Archived from the original on October 15, 2021. Retrieved December 14, 2021.
- ↑ "About Us". Chelveston Renewable Energy. Archived from the original on October 15, 2021. Retrieved December 14, 2021.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 UKGov2022
- ↑ 4.0 4.1 4.2 "Renewable Energy Planning Database". United Kingdom Government. March, 2021. Retrieved May 24, 2021.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link)