Chelveston Renewable Energy Park wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Chelveston Renewable Energy Park wind farm East Northamptonshire (Phase East Northamptonshire), Chelveston Renewable Energy Park wind farm Bedford (Phase Bedford)
Chelveston Renewable Energy Park wind farm is an operating wind farm in Northamptonshire, East Midlands, England, United Kingdom.
Project Details
Table 1: Phase-level project details for Chelveston Renewable Energy Park wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Operator |
---|---|---|---|---|---|
Bedford | Operating[1] | 2014[1] | 10 MW[1] | Onshore[1] | Chelveston Renewable Energy[1] |
East Northamptonshire | Operating[1] | 2014[1] | 12.5 MW[1] | Onshore[1] | Chelveston Renewable Energy[1] |
Location
Table 2: Phase-level location details for Chelveston Renewable Energy Park wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
Bedford | Northamptonshire, East Midlands, England, United Kingdom[1] | 52.3076, -0.5373 (exact)[1] |
East Northamptonshire | Northamptonshire, East Midlands, England, United Kingdom[1] | 52.3012, -0.5366 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References