Chemoga Yeda I hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Chemoga Yeda I hydroelectric plant is a hydroelectric power plant in pre-construction in Debre Markos, East Gojjam, Amhara, Ethiopia.

Project Details

Table 1: Project details for Chemoga Yeda I hydroelectric plant

Status Nameplate capacity Turbines Technology type Owner
Pre-construction[1] 162 MW[2] 2 x 81 MW[3] Conventional storage[4] Ethiopian Electric Power Corp [100%] (ኢትዮጵያ ኤሌክትሪክ ኃይል)[2]

Location

Table 2: Location details for Chemoga Yeda I hydroelectric plant

Location River Coordinates (WGS 84)
Debre Markos, East Gojjam, Amhara, Amhara, Ethiopia[4][5] Abay River[4] 10.3202, 37.732 (approximate)[4][5]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. (PDF) https://eneken.ieej.or.jp/data/12629.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://web.archive.org/web/20240125154506/https://ethiopianembassy.org/wp-content/uploads/2021/06/Pipeline-Projects-2020-and-21.pdf. Archived from the original (PDF) on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  3. https://www.power-technology.com/data-insights/power-plant-profile-chemoga-yeda-ethiopia/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 (PDF) https://web.archive.org/web/20220915164945/https://entrospace.nilebasin.org/bitstream/handle/20.500.12351/101/35_M3_Vol3_ETH_Main_Report.pdf?sequence=1&isAllowed=y. Archived from the original (PDF) on 2022-09-15. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 (PDF) https://web.archive.org/web/20220914174240/https://entrospace.nilebasin.org/bitstream/handle/20.500.12351/101/35_M3_Vol3_ETH_Main_Report.pdf?sequence=1&isAllowed=y%27. Archived from the original (PDF) on 2022-09-14. {{cite web}}: Missing or empty |title= (help)