Chevelon Butte wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Chevelon Butte wind farm is a wind farm under construction in Winslow, Navajo County, Arizona, United States.


Project Details

Table 1: Phase-level project details for Chevelon Butte wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Owner
1 Construction[1] 2023 (planned)[2] 477[3] Onshore Sustainable Power Group LLC (SPOWER)[3]


Location

Table 2: Phase-level location details for Chevelon Butte wind farm

Phase name Location Coordinates (WGS 84)
1 Winslow, Navajo County, Arizona, United States[4] 34.6336, -110.8810 (approximate)[3]

The map below shows the approximate location of the wind farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://azdailysun.com/news/local/enviro/chevelon-butte-wind-farm-begins-construction-south-of-winslow/article_9f5e66f4-c66a-55da-986f-3f4a51ef322c.html. Archived from the original on July 13, 2022. {{cite web}}: Missing or empty |title= (help)
  2. https://www.aes.com/chevelon-butte. Archived from the original on September 27, 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 Aleshire , Peter. "Navajo County Supervisors Approve Massive Wind Farm". White Mountain Independent. Archived from the original on November 5, 2021. Retrieved December 6, 2021.
  4. "starlightpinesranchettes.org/wp-content/uploads/2019/11/S-Power_Chevelon_HandoutV3_Digital.pdf" (PDF). Archived from the original (PDF) on November 5, 2021. Retrieved November 17, 2021.