Chicamocha Solar Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Chicamocha Solar Project (Proyecto Solar Chicamocha) is a solar photovoltaic (PV) farm in pre-construction in Los Santos, Santander, Colombia.

Project Details

Table 1: Phase-level project details for Chicamocha Solar Project

Phase name Status Nameplate capacity Technology Owner Operator
1 Pre-construction[1] 19.9 MWac[2] PV[3] Celsia Colombia SA ESP [100%][4] Celsia Colombia[4]
2 Pre-construction[5] 19.9 MWac[2] PV[6] Celsia Colombia SA ESP [100%][4] Celsia Colombia[4]
3 Pre-construction[5] 19.9 MWac[2] PV[7] Celsia Colombia SA ESP [100%][4] Celsia Colombia[4]
4 Pre-construction[1] 19.9 MWac[2] PV[8] Celsia Colombia SA ESP [100%][4] Celsia Colombia[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Chicamocha Solar Project

Phase Name Location Coordinates (WGS 84)
1 Los Santos, Los Santos, Santander, Colombia[2] 7.8267, -72.4719 (approximate)[2]
2 Los Santos, Los Santos, Santander, Colombia[2] 7.8267, -72.4719 (approximate)[2]
3 Los Santos, Los Santos, Santander, Colombia[2] 7.8267, -72.4719 (approximate)[2]
4 Los Santos, Los Santos, Santander, Colombia[2] 7.8267, -72.4719 (approximate)[2]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 https://www1.upme.gov.co/siel/Informes_Registro_Proyectos_Generacion/Semana_23_2023.xlsx https://www.essa.com.co/site/accionistas/pagina-detalle/en-2023-essa-remodelo-cuatro-subestaciones-y-puso-en-servicio-mesa-del-sol, https://www1.upme.gov.co/siel/Informes_Registro_Proyectos_Generacion/Semana_23_2023.xlsx. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.
  3. ↑ https://www1.upme.gov.co/siel/Pages/Inscripcion-proyectos-generacion.aspx https://www.power-technology.com/marketdata/celsia-chicamocha-solar-pv-park-1-colombia/, https://www1.upme.gov.co/siel/Pages/Inscripcion-proyectos-generacion.aspx. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://web.archive.org/web/20240125171503/https://www1.upme.gov.co/Normatividad/Anexo_articulo_50_R_CREG_075_2021_Circ_030.xlsx. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 https://www1.upme.gov.co/siel/Pages/Inscripcion-proyectos-generacion.aspx https://www.essa.com.co/site/accionistas/pagina-detalle/en-2023-essa-remodelo-cuatro-subestaciones-y-puso-en-servicio-mesa-del-sol, https://www1.upme.gov.co/siel/Pages/Inscripcion-proyectos-generacion.aspx. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. ↑ https://web.archive.org/web/20240207121148/https://www.power-technology.com/marketdata/power-plant-profile-celsia-chicamocha-solar-pv-park-2-colombia/. Archived from the original on 2024-02-07. {{cite web}}: Missing or empty |title= (help)
  7. ↑ https://web.archive.org/web/20240207121029/https://www.power-technology.com/marketdata/power-plant-profile-celsia-chicamocha-solar-pv-park-3-colombia/. Archived from the original on 2024-02-07. {{cite web}}: Missing or empty |title= (help)
  8. ↑ https://web.archive.org/web/20240207121008/https://www.power-technology.com/marketdata/power-plant-profile-celsia-chicamocha-solar-pv-park-4-colombia/. Archived from the original on 2024-02-07. {{cite web}}: Missing or empty |title= (help)