Chillingham solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Chillingham solar farm is an operating solar photovoltaic (PV) farm in Bell County, Texas, United States.

Project Details

Table 1: Phase-level project details for Chillingham solar farm

Phase name Status Commissioning year Nameplate capacity Technology
CHILS Operating[1] 2025[1] 350 MWac[2] PV[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Chillingham solar farm

Phase Name Location Coordinates (WGS 84)
CHILS Bell County, Texas, United States[2] 31.0060, -97.2620 (exact)[2]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 (PDF) https://www.ercot.com/files/docs/2025/05/02/MORA_July2025.pdf. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.