China Coal Group Yili cogen power station (中煤伊犁2×66万千瓦热电联产项目) is a power station in Yining, Ili Prefecture, Xinjiang, China with multiple units of varying statuses, none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
China Coal Group Yili cogen power station Yining, Ili Prefecture, Xinjiang, China 44.076203, 81.49084 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase II Unit 3, Phase II Unit 4, Unit 1, Unit 2: 44.076203, 81.49084

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Phase II Unit 3 Announced[2] coal: unknown[2][3] 660[2] ultra-supercritical[2] – – False
Phase II Unit 4 Announced[2] coal: unknown[2][3] 660[2] ultra-supercritical[2] – – False
Unit 1 Construction[4] coal: unknown[3] 660[5] ultra-supercritical[5] yes 2026 (planned)[4] False
Unit 2 Construction[4] coal: unknown[3] 660[5] ultra-supercritical[5] yes 2026 (planned)[4] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase II Unit 3 China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100%][1] China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100.0%]
Phase II Unit 4 China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100%][1] China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100.0%]
Unit 1 China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100%][1] China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100.0%]
Unit 2 China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100%][1] China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic
  • Permit(s): 新发改批复[2023]147号)[4]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Bidding calls for the project's environmental impact assessment (EIA) and social stability risk assessment were put out in 2023[6], but the EIA report was only approved by the Xinjiang Uyghur Autonomous Region Ecology and Environment in February 2025[7][8]. The soil and water conservation plan received approval from the Xinjiang Uyghur Autonomous Region Water Resources Department in October 2024[9].

A construction starting ceremony was held in June 2024 and the foundation was laid[10]. However, the actual construction did not begin until the end of 2024. Construction was making good progress in 2025, and the two units were planned to commence operation in 2026[11][12].

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 https://sthjt.xinjiang.gov.cn/xjepd/hjyxpjspgskn/202503/50e8c2d1bef84bd79fcd5ac5b5902cb0.shtml. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://mp.weixin.qq.com/s/P16dBr0VeTys_2zJqrudPw. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 4.4 "中煤伊犁2x66万千瓦热电联产工程脱硫系统EPC总承包项目公告". 北极星火力发电网. 2025-03-07. Archived from the original on 2026-05-14. Retrieved 2025-9-3. {{cite web}}: Check date values in: |access-date= (help)
  5. ↑ 5.0 5.1 5.2 5.3 https://www.nengyuanjie.net/article/98512.html. {{cite web}}: Missing or empty |title= (help)
  6. ↑ "中煤集团2×660MW热电联产新项目". 电力项目圈. 2024-2-23. Retrieved 2025-94. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  7. ↑ "新疆维吾尔自治区生态环境厅环境影响评价与排放管理处关于2025年1月16日拟作出的建设项目环境影响评价文件批复决定的公示". 新疆生态环境厅网站. 2025-01-16. Retrieved 2025-9-4. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  8. ↑ "关于中煤伊犁2×66万千瓦热电联产项目环境影响报告书的批复". 新疆生态环境厅网站. 2025-03-03. Retrieved 2025-9-4. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  9. ↑ "关于中煤伊犁2×66万千瓦热电联产项目水土保持方案的批复". 新疆维吾尔自治区水利厅网站. 2024-10-13. Retrieved 2025-9-4. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  10. ↑ "中煤伊犁2×66 万千瓦热电联产工程开工奠基仪式举行". 新疆伊犁哈萨克自治州人民政府网站. 2024-07-02. Retrieved 2025-9-4. {{cite web}}: |first= missing |last= (help); Check date values in: |access-date= (help)CS1 maint: url-status (link)
  11. ↑ "中煤伊犁2x66万千瓦热电联产工程脱硫系统EPC总承包项目公告". 北极星火力发电网. 2025-03-07. Retrieved 2025-9-4. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  12. ↑ "中煤伊犁2×66万千瓦热电联产项目工程全速推进". 火电之声WeChat Official Accounts Platform. 2025-7-25. Retrieved 2025-9-4. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)