China Coal Group Yili cogen power station (中煤伊犁2×66万千瓦热电联产项目) is a power station in Yining, Ili Prefecture, Xinjiang, China with multiple units of varying statuses, none of which are currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| China Coal Group Yili cogen power station | Yining, Ili Prefecture, Xinjiang, China | 44.076203, 81.49084 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase II Unit 3, Phase II Unit 4, Unit 1, Unit 2: 44.076203, 81.49084
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Phase II Unit 3 | Announced[2] | coal: unknown[2][3] | 660[2] | ultra-supercritical[2] | – | – | False |
| Phase II Unit 4 | Announced[2] | coal: unknown[2][3] | 660[2] | ultra-supercritical[2] | – | – | False |
| Unit 1 | Construction[4] | coal: unknown[3] | 660[5] | ultra-supercritical[5] | yes | 2026 (planned)[4] | False |
| Unit 2 | Construction[4] | coal: unknown[3] | 660[5] | ultra-supercritical[5] | yes | 2026 (planned)[4] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase II Unit 3 | China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100%][1] | China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100.0%] |
| Phase II Unit 4 | China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100%][1] | China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100.0%] |
| Unit 1 | China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100%][1] | China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100.0%] |
| Unit 2 | China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100%][1] | China Coal Group Yili Energy Development Co., Ltd. Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic
- Permit(s): 新发改批复[2023]147号)[4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Bidding calls for the project's environmental impact assessment (EIA) and social stability risk assessment were put out in 2023[6], but the EIA report was only approved by the Xinjiang Uyghur Autonomous Region Ecology and Environment in February 2025[7][8]. The soil and water conservation plan received approval from the Xinjiang Uyghur Autonomous Region Water Resources Department in October 2024[9].
A construction starting ceremony was held in June 2024 and the foundation was laid[10]. However, the actual construction did not begin until the end of 2024. Construction was making good progress in 2025, and the two units were planned to commence operation in 2026[11][12].
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://sthjt.xinjiang.gov.cn/xjepd/hjyxpjspgskn/202503/50e8c2d1bef84bd79fcd5ac5b5902cb0.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://mp.weixin.qq.com/s/P16dBr0VeTys_2zJqrudPw.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 "中煤伊犁2x66万千瓦热电联产工程脱硫系统EPC总承包项目公告". 北极星火力发电网. 2025-03-07. Archived from the original on 2026-05-14. Retrieved 2025-9-3.
{{cite web}}: Check date values in:|access-date=(help) - ↑ 5.0 5.1 5.2 5.3 https://www.nengyuanjie.net/article/98512.html.
{{cite web}}: Missing or empty|title=(help) - ↑ "中煤集团2×660MW热电联产新项目". 电力项目圈. 2024-2-23. Retrieved 2025-94.
{{cite web}}: Check date values in:|access-date=and|date=(help)CS1 maint: url-status (link) - ↑ "新疆维吾尔自治区生态环境厅环境影响评价与排放管理处关于2025年1月16日拟作出的建设项目环境影响评价文件批复决定的公示". 新疆生态环境厅网站. 2025-01-16. Retrieved 2025-9-4.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "关于中煤伊犁2×66万千瓦热电联产项目环境影响报告书的批复". 新疆生态环境厅网站. 2025-03-03. Retrieved 2025-9-4.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "关于中煤伊犁2×66万千瓦热电联产项目水土保持方案的批复". 新疆维吾尔自治区水利厅网站. 2024-10-13. Retrieved 2025-9-4.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "中煤伊犁2×66 万千瓦热电联产工程开工奠基仪式举行". 新疆伊犁哈萨克自治州人民政府网站. 2024-07-02. Retrieved 2025-9-4.
{{cite web}}:|first=missing|last=(help); Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "中煤伊犁2x66万千瓦热电联产工程脱硫系统EPC总承包项目公告". 北极星火力发电网. 2025-03-07. Retrieved 2025-9-4.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "中煤伊犁2×66万千瓦热电联产项目工程全速推进". 火电之声WeChat Official Accounts Platform. 2025-7-25. Retrieved 2025-9-4.
{{cite web}}: Check date values in:|access-date=and|date=(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.