China Coal Group Yili cogen power station (中煤伊犁2×66万千瓦热电联产项目) is a power station under construction in Yining, Ili Prefecture, Xinjiang, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
China Coal Group Yili cogen power station | Yining, Ili Prefecture, Xinjiang, China | 44.078284, 81.492708 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 44.078284, 81.492708
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
Unit 1 | Construction | coal: unknown | 660 | ultra-supercritical | yes | 2026 (planned) |
Unit 2 | Construction | coal: unknown | 660 | ultra-supercritical | yes | 2026 (planned) |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | China Coal Group Yili Energy Development Co., Ltd. Co Ltd | China Coal Group Yili Energy Development Co., Ltd. Co Ltd |
Unit 2 | China Coal Group Yili Energy Development Co., Ltd. Co Ltd | China Coal Group Yili Energy Development Co., Ltd. Co Ltd |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Bidding calls for the project's environmental impact assessment (EIA) and social stability risk assessment were put out in 2023[1], but the EIA report was only approved by the Xinjiang Uyghur Autonomous Region Ecology and Environment in February 2025[2][3]. The soil and water conservation plan received approval from the Xinjiang Uyghur Autonomous Region Water Resources Department in October 2024[4].
A construction starting ceremony was held in June 2024 and the foundation was laid[5]. However, the actual construction did not begin until the end of 2024. Construction was making good progress in 2025, and the two units were planned to commence operation in 2026[6][7].
Articles and Resources
References
- ↑ "中煤集团2×660MW热电联产新项目". 电力项目圈. 2024-2-23. Retrieved 2025-94.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ "新疆维吾尔自治区生态环境厅环境影响评价与排放管理处关于2025年1月16日拟作出的建设项目环境影响评价文件批复决定的公示". 新疆生态环境厅网站. 2025-01-16. Retrieved 2025-9-4.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "关于中煤伊犁2×66万千瓦热电联产项目环境影响报告书的批复". 新疆生态环境厅网站. 2025-03-03. Retrieved 2025-9-4.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "关于中煤伊犁2×66万千瓦热电联产项目水土保持方案的批复". 新疆维吾尔自治区水利厅网站. 2024-10-13. Retrieved 2025-9-4.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "中煤伊犁2×66 万千瓦热电联产工程开工奠基仪式举行". 新疆伊犁哈萨克自治州人民政府网站. 2024-07-02. Retrieved 2025-9-4.
{{cite web}}
:|first=
missing|last=
(help); Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "中煤伊犁2x66万千瓦热电联产工程脱硫系统EPC总承包项目公告". 北极星火力发电网. 2025-03-07. Retrieved 2025-9-4.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "中煤伊犁2×66万千瓦热电联产项目工程全速推进". 火电之声WeChat Official Accounts Platform. 2025-7-25. Retrieved 2025-9-4.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.