China Coal Guangyuan power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
China Coal Guangyuan power station (中煤广元燃煤电一体化项目) is an operating power station of at least 1000-megawatts (MW) in Baolun Town, Lizhou District, Guangyuan, Sichuan, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| China Coal Guangyuan power station | Baolun Town, Lizhou District, Guangyuan, Sichuan, China | 32.330909, 105.574993 (exact)[1] |
Unit-level coordinates (WGS 84):
- Unit 1: 32.330909, 105.574993
- Unit 2: 32.3324504, 105.5846539
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Operating[2][3][4] | coal: unknown[5][6] | 1000[2][5] | ultra-supercritical[1] | 2026[7][3] | False |
| Unit 2 | Construction[1] | coal: unknown[5][6] | 1000[1][4] | ultra-supercritical[1] | 2026 (planned)[2] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Middling Coal Guangyuan Energy Co Ltd [100%][1] | China National Coal Group [100.0%] |
| Unit 2 | Middling Coal Guangyuan Energy Co Ltd [100%][1] | China National Coal Group [100.0%] |
Project-level coal details
- Coal source(s): domestic
- Permit(s): 川发改能源〔2023〕366号[1]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The power station is part of the China Coal Guangyuan Coal-electricity Integration Project, intending to strengthen the Sichuan provincial electricity supply[8].
The feasibility study of the project was passed in April 2023[9].
On 20 July 2023, Sichuan Province Development and Reform Commission granted the project a permit (Chuan Fa Gai Neng Yuan〔2023〕No.366) to build, making it the first permitted coal-fired power station since the 13th Five-Year-Plan in Sichuan province.[10][11][12][13][14]
The first concrete was poured on 15 May 2024.[15] Unit 1 boiler steel hoisting began in November 2024. By March 2026, the unit was in the commissioning phase, targeting commercial operation by 28 June 2026.[16]
Unit 2 heat treatment tenders were issued in 2025. It's currently under construction with expected completion after Unit 1.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "四川省发展和改革委员会关于中煤广元燃煤发电项目核准的批复". fgw.sc.gov.cn. 2023-07-25. Archived from the original on 2024-01-25. Retrieved 2023-10-26.
- ↑ 2.0 2.1 2.2 "2×100万千瓦!中煤广元燃煤发电项目获核准批复-北极星火力发电网". news.bjx.com.cn. 2023-07-26. Archived from the original on 2024-01-25. Retrieved 2023-10-26.
- ↑ 3.0 3.1 https://news.bjx.com.cn/html/20260629/1501969.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 "中煤广元燃煤发电2×1000MW新建工程项目成功浇筑第一罐混凝土-北极星火力发电网". news.bjx.com.cn. 2024-05-16. Archived from the original on 2024-05-29. Retrieved 2024-05-28.
- ↑ 5.0 5.1 5.2 "疯狂煤电新成员+1!总投资72.7亿元!2×1000MW!中煤广元燃煤发电项目核准,正式落地利州..." Weixin Official Accounts Platform. 2023-07-25. Archived from the original on 2024-01-25. Retrieved 2023-10-26.
- ↑ 6.0 6.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ "中煤广元燃煤发电项目获省发展改革委核准批复-政府信息公开-广元市人民政府". www.cngy.gov.cn. 2023-07-25. Archived from the original on 2024-01-25. Retrieved 2023-10-26.
- ↑ "中煤广元煤电一体化项目正式落户利州". 人民网. 2023-4-21.
{{cite web}}: Check date values in:|date=(help)CS1 maint: url-status (link) - ↑ "2×100万千瓦!中煤广元燃煤发电项目可行性研究报告通过外部审查". 北极星火力发电网. 2023-04-13.
{{cite web}}: CS1 maint: url-status (link) - ↑ 能源局电力处 (2023-07-25). "四川省发展和改革委员会关于中煤广元燃煤发电项目核准的批复(川发改能源〔2023〕366号)". 四川省发展和改革委员会. Retrieved 2023-8-23.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "中煤广元燃煤发电项目获省发展改革委核准批复". 广元市人民政府网站. 2023-07-25. Retrieved 2023-8-23.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ 广元发展改革 (2023-07-26). "2×100万千瓦!中煤广元燃煤发电项目获核准批复". 北极星火力发电网. Retrieved 2023-8-23.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "疯狂煤电新成员+1!总投资72.7亿元!2×1000MW!中煤广元燃煤发电项目核准,正式落地利州..." 能源电力新观察. 2023-07-25. Retrieved 2023-8-23.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ 广元发改委 (2023-07-27). "四川"十三五"至今核准的首个燃煤发电项目获批". 电煤圈. Retrieved 2023-8-25.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "中煤广元燃煤发电项目第一罐混凝土浇筑". 北极星电力网. 2024-05-16. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中煤广元项目#1机组全面进入调试阶段". 北极星电力网. 2026-03-27. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.