China Coal Guangyuan power station (中煤广元燃煤电一体化项目) is an operating power station of at least 1000-megawatts (MW) in Baolun Town, Lizhou District, Guangyuan, Sichuan, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
China Coal Guangyuan power station Baolun Town, Lizhou District, Guangyuan, Sichuan, China 32.330909, 105.574993 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1: 32.330909, 105.574993
  • Unit 2: 32.3324504, 105.5846539

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 1 Operating[2][3][4] coal: unknown[5][6] 1000[2][5] ultra-supercritical[1] 2026[7][3] False
Unit 2 Construction[1] coal: unknown[5][6] 1000[1][4] ultra-supercritical[1] 2026 (planned)[2] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Middling Coal Guangyuan Energy Co Ltd [100%][1] China National Coal Group [100.0%]
Unit 2 Middling Coal Guangyuan Energy Co Ltd [100%][1] China National Coal Group [100.0%]

Project-level coal details

  • Coal source(s): domestic
  • Permit(s): 川发改能源〔2023〕366号[1]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The power station is part of the China Coal Guangyuan Coal-electricity Integration Project, intending to strengthen the Sichuan provincial electricity supply[8].

The feasibility study of the project was passed in April 2023[9].

On 20 July 2023, Sichuan Province Development and Reform Commission granted the project a permit (Chuan Fa Gai Neng Yuan〔2023〕No.366) to build, making it the first permitted coal-fired power station since the 13th Five-Year-Plan in Sichuan province.[10][11][12][13][14]

The first concrete was poured on 15 May 2024.[15] Unit 1 boiler steel hoisting began in November 2024. By March 2026, the unit was in the commissioning phase, targeting commercial operation by 28 June 2026.[16]

Unit 2 heat treatment tenders were issued in 2025. It's currently under construction with expected completion after Unit 1.

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "四川省发展和改革委员会关于中煤广元燃煤发电项目核准的批复". fgw.sc.gov.cn. 2023-07-25. Archived from the original on 2024-01-25. Retrieved 2023-10-26.
  2. 2.0 2.1 2.2 "2×100万千瓦!中煤广元燃煤发电项目获核准批复-北极星火力发电网". news.bjx.com.cn. 2023-07-26. Archived from the original on 2024-01-25. Retrieved 2023-10-26.
  3. 3.0 3.1 https://news.bjx.com.cn/html/20260629/1501969.shtml. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 "中煤广元燃煤发电2×1000MW新建工程项目成功浇筑第一罐混凝土-北极星火力发电网". news.bjx.com.cn. 2024-05-16. Archived from the original on 2024-05-29. Retrieved 2024-05-28.
  5. 5.0 5.1 5.2 "疯狂煤电新成员+1!总投资72.7亿元!2×1000MW!中煤广元燃煤发电项目核准,正式落地利州..." Weixin Official Accounts Platform. 2023-07-25. Archived from the original on 2024-01-25. Retrieved 2023-10-26.
  6. 6.0 6.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  7. "中煤广元燃煤发电项目获省发展改革委核准批复-政府信息公开-广元市人民政府". www.cngy.gov.cn. 2023-07-25. Archived from the original on 2024-01-25. Retrieved 2023-10-26.
  8. "中煤广元煤电一体化项目正式落户利州". 人民网. 2023-4-21. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  9. "2×100万千瓦!中煤广元燃煤发电项目可行性研究报告通过外部审查". 北极星火力发电网. 2023-04-13.{{cite web}}: CS1 maint: url-status (link)
  10. 能源局电力处 (2023-07-25). "四川省发展和改革委员会关于中煤广元燃煤发电项目核准的批复(川发改能源〔2023〕366号)". 四川省发展和改革委员会. Retrieved 2023-8-23. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  11. "中煤广元燃煤发电项目获省发展改革委核准批复". 广元市人民政府网站. 2023-07-25. Retrieved 2023-8-23. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  12. 广元发展改革 (2023-07-26). "2×100万千瓦!中煤广元燃煤发电项目获核准批复". 北极星火力发电网. Retrieved 2023-8-23. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  13. "疯狂煤电新成员+1!总投资72.7亿元!2×1000MW!中煤广元燃煤发电项目核准,正式落地利州..." 能源电力新观察. 2023-07-25. Retrieved 2023-8-23. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  14. 广元发改委 (2023-07-27). "四川"十三五"至今核准的首个燃煤发电项目获批". 电煤圈. Retrieved 2023-8-25. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  15. "中煤广元燃煤发电项目第一罐混凝土浇筑". 北极星电力网. 2024-05-16. Retrieved 2026-06-12.{{cite web}}: CS1 maint: url-status (link)
  16. "中煤广元项目#1机组全面进入调试阶段". 北极星电力网. 2026-03-27. Retrieved 2026-06-12.{{cite web}}: CS1 maint: url-status (link)