China Coal Guangyuan power station (中煤广元燃煤电一体化项目) is a permitted power station in Baolun Town, Lizhou District, Guangyuan, Sichuan, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
China Coal Guangyuan power station Baolun Town, Lizhou District, Guangyuan, Sichuan, China 32.3324504, 105.5846539 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 32.3324504, 105.5846539

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 permitted[2] coal - unknown 1000[2][3] ultra-supercritical[1] 2025[4]
Unit 2 permitted[1] coal - unknown 1000[1] ultra-supercritical[1] 2026[2]

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Middling Coal Guangyuan Energy Co Ltd [100.0%]
Unit 2 Middling Coal Guangyuan Energy Co Ltd [100.0%]

Project-level coal details

  • Permit(s): July 20, 2023, July 20, 2023 – 川发改能源〔2023〕366号[1]

Background

The power station is part of the China Coal Guangyuan Coal-electricity Integration Project, intending to strengthen the Sichuan provincial electricity supply[5].

The feasibility study of the project was passed in April 2023[6].

On 20 July 2023, Sichuan Province Development and Reform Commission granted the project a permit (川发改能源〔2023〕366号) to build, making it as the first permitted coal-fired power station since the 13th Five-Year-Plan in Sichuan province.[7][8][9][10][11]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240125125717/http://fgw.sc.gov.cn//sfgw/c106096/2023/7/25/df9c9f49a5104f87b36286e67ffc309d.shtml. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240125125723/https://news.bjx.com.cn/html/20230726/1321587.shtml. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240125130043/https://mp.weixin.qq.com/s/GmqfA1HeAYPgb3YlP6ccSw. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240125125724/https://www.cngy.gov.cn/govop/show/20230725102640-19040-00-000.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. "中煤广元煤电一体化项目正式落户利州". 人民网. 2023-4-21. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  6. "2×100万千瓦!中煤广元燃煤发电项目可行性研究报告通过外部审查". 北极星火力发电网. 2023-04-13.{{cite web}}: CS1 maint: url-status (link)
  7. 能源局电力处 (2023-07-25). "四川省发展和改革委员会关于中煤广元燃煤发电项目核准的批复(川发改能源〔2023〕366号)". 四川省发展和改革委员会. Retrieved 2023-8-23. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  8. "中煤广元燃煤发电项目获省发展改革委核准批复". 广元市人民政府网站. 2023-07-25. Retrieved 2023-8-23. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  9. 广元发展改革 (2023-07-26). "2×100万千瓦!中煤广元燃煤发电项目获核准批复". 北极星火力发电网. Retrieved 2023-8-23. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  10. "疯狂煤电新成员+1!总投资72.7亿元!2×1000MW!中煤广元燃煤发电项目核准,正式落地利州..." 能源电力新观察. 2023-07-25. Retrieved 2023-8-23. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  11. 广元发改委 (2023-07-27). "四川"十三五"至今核准的首个燃煤发电项目获批". 电煤圈. Retrieved 2023-8-25. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)