China Resources Dengkou power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

China Resources Dengkou power station (华润电力内蒙古磴口金牛发电厂) is an operating power station of at least 660-megawatts (MW) in Bayangaole Town, Dengkou, Bayannur, Inner Mongolia, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
China Resources Dengkou power station Bayangaole Town, Dengkou, Bayannur, Inner Mongolia, China 40.383747, 107.003843 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 40.383747, 107.003843

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - bituminous 330 subcritical 2009
Phase I Unit 2 operating coal - bituminous 330 subcritical 2009
Phase II Unit 3 cancelled coal - bituminous 600 subcritical
Phase II Unit 4 cancelled coal - bituminous 600 subcritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Inner Mongolia Dengkou Jinniu Coal and Electricity Co Ltd [100.0%]
Phase I Unit 2 Inner Mongolia Dengkou Jinniu Coal and Electricity Co Ltd [100.0%]
Phase II Unit 3 Inner Mongolia Dengkou Jinniu Coal and Electricity Co Ltd [100.0%]
Phase II Unit 4 Inner Mongolia Dengkou Jinniu Coal and Electricity Co Ltd [100.0%]

Project-level coal details

  • Permit(s): July 2009

Background

The two existing coal-fired units of Dengkou power station, totaling 660 MW, were brought online in 2009. The plant is majority-owned by China Resources.[1][2]

Description of Expansion

China Resources is currently planning to build at least two additional coal-fired units at this plant, with a total planned capacity of 1,200 MW.[1][2]

2016: Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

Due to new restrictions announced during 2016 by the National Energy Administration and the National Development and Reform Commission, further capacity expansions at this location appear to be on hold or cancelled. For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.

Plant Details for Existing Phase I

  • Sponsor: China Resources Power Construction Service Co (75%), Jizhong Energy Group Xingtai Mine Industry Group (25%)
  • Parent company: China Resources (75%), Jizhong Energy Group (25%)
  • Location: Dengkou County, Bayannur (Bayannao'er) Prefecture, Inner Mongolia Autonomous Region, China
  • Coordinates: 40.3837469, 107.0038426 (exact)
  • Status: Operating
  • Gross capacity: 660 MW (Units 1 & 2: 300 MW)
  • Type: Subcritical
  • In service: 2009
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and Resources

References

  1. 1.0 1.1 "内蒙古磴口华润金牛2×600MW发电(二期)项目", 巴彦淖尔招商网, 2012-02-14
  2. 2.0 2.1 "内蒙古磴口华润金牛2×600MW发电(二期)项目", 巴彦淖尔市政府门户网站, 2012-03-13