China Resources Wenzhou power station (华润电力温州发电厂) is an operating power station of at least 2000-megawatts (MW) in Bacao Town Pipamen, Cangnan, Wenzhou, Zhejiang, China with multiple units, some of which are not currently operating. It is also known as 华润苍南发电厂一期; Huarun Cangnan power station (Phase I Unit 1, Phase I Unit 2), 华润苍南发电厂二期 (Phase II Unit 3, Phase II Unit 4).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
China Resources Wenzhou power station Bacao Town Pipamen, Cangnan, Wenzhou, Zhejiang, China 27.4974228, 120.6631851 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 27.4974228, 120.6631851

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - bituminous 1000 ultra-supercritical 2014
Phase I Unit 2 operating coal - bituminous 1000 ultra-supercritical 2014
Phase II Unit 3 construction coal - bituminous 1000 ultra-supercritical 2025
Phase II Unit 4 construction coal - bituminous 1000 ultra-supercritical 2025

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 China Resources Power (Wenzhou) Co Ltd [100.0%]
Phase I Unit 2 China Resources Power (Wenzhou) Co Ltd [100.0%]
Phase II Unit 3 China Resources Power (Wenzhou) Co Ltd [100.0%]
Phase II Unit 4 China Resources Power (Wenzhou) Co Ltd [100.0%]

Project-level coal details

  • Permit(s): June 13, 2022, November 8, 2022, December 19, 2011

Background on Project

China Resources Power Holdings began leading a consortium building a two-unit coal-fired power plant with a total planned capacity of 2,000 MW in Zhejiang Province. The project was approved in 2009.[1]

In January 2014 it was reported that Unit 1 had gone into operation, having been built in less than 23 months. Unit 2 was expected to begin operation in April 2014.[2][3][4]

Proposed expansion

In June 2014, China Resources was seeking permits to expand the power by station by two ultra-supercritical units of 1,000 MW each.[5]

In 2021, with no developments on the units since their announcement in June 2014, plans appeared cancelled.

However, by 2022, the project was revived and Unit 3 received a permit in June 2022.[6][7][8]

Construction on Unit 3 reportedly began in October 2022.[9] Unit 4 was reportedly permitted on November 8, 2022.[10][11]

In March 2023, though previously thought to be further in development, bidding was underway for the development of Unit 3.[12] In June 2023, candidates were selected from the bidding process.[13] Construction of Unit 3 began in June 2023.[14][15]

In June 2023, bidding was announced for the environmental impact assessment of Phase II Unit 4.[16] Construction also reportedly began on Unit 4 in June 2023.[17][18]

Articles and Resources

References

  1. "苍南县在浙洽会成功签约华润苍南发电厂二期重大项目," Ministry of Commerce, 2014-06-17
  2. "华润苍南发电厂1号机组投产," 来源:温州网-温州日报, 26 January 2014
  3. "华润苍南电厂2号机并网一次成功(图片新闻)", 人民网, 2014-04-14
  4. "华润苍南发电厂1号机组投产", 温州网-温州日报, 2014-01-26
  5. "华润电力浙江苍南发电厂二期重大项目签约," 来源:浙江商务厅, 2014/6/17
  6. 2×1000MW!华润电力温州电厂二期扩建工程超超临界燃煤发电机组项目勘察设计招标, BJX, 2022-04-2
  7. 企业投资(含外商投资)项目核准(基本建设), Zhezhiang province, 2022-04-02
  8. 1000MW!华润电力浙江公司温州电厂3#机正式获得省发改委核准批复, BJX, 2022-06-15
  9. 1000MW!华润电力温州电厂三号机组顺利开工, BJX, 2022-10-10
  10. 1000MW!华润电力浙江公司温州电厂4号机正式获得省发改委核准批复, BJX, 2022-11-08
  11. 关于火电前期项目优选结果的公示, fzggw.zj.gov.cn, 2022-09-16 (华润电力温州电厂二期(4号机)项目和国能北仑电厂一期节能减排改造项目作为火电前期项目)
  12. 2×1000MW!华润电力温州电厂二期项目相关的10项中标公示, news.bjx.com, 2023-03-17
  13. 华润电力4个2×1000MW煤电项目设备监造中标公示, news.bjx.com, 2023-06-07
  14. 华润电力温州电厂二期项目开工!, news.bjx.com, 2023-06-30
  15. 华润电力2×1000MW煤电项目正式开工, mp.weixin.qq.com, 2023-06-30
  16. 1000MW!华润电力温州电厂二期项目扩建工程4号机环境影响评价技术服务招标公告, news.bjx.com, 2023-06-15
  17. 华润电力温州电厂二期项目开工!, news.bjx.com, 2023-06-30
  18. 华润电力2×1000MW煤电项目正式开工, mp.weixin.qq.com, 2023-06-30

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.