Chocolate Mountains solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Chocolate Mountains solar farm is a solar photovoltaic (PV) farm in Chocolate Mountains, Imperial County, California, United States.

Project Details

Table 1: Phase-level project details for Chocolate Mountains solar farm

Status Nameplate capacity Technology Owner
Cancelled (inferred July 2023) 50 MW[1] PV[1] Avantus; Gestamp Solar[2][3][2][3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Chocolate Mountains solar farm

Location Coordinates (WGS 84)
Chocolate Mountains, Imperial County, California, United States[1] 33.2996, -115.293 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20220211173809/https://www.8minute.com/2011/06/imperial-valleys-largest-solar-developer-8minute-renewables-joins-el-centro-chamber-of-commerces-presidents-circle/. Archived from the original on 11 February 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240206175028/https://www.pv-tech.org/us-developer-8minute-solar-energy-rebrands-as-avantus/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240206195313/https://renewablesnow.com/news/us-8minurenergy-gestamp-solar-get-interconnection-agreements-for-355-mw-of-solar-power-in-california-142652/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)