Chokecherry And Sierra Madre Wind Energy Project is a wind farm under construction in Carbon County, Wyoming, United States.


Project Details

Table 1: Phase-level project details for Chokecherry And Sierra Madre Wind Energy Project

Phase name Status Commissioning year Nameplate capacity Mount type Owner
1A Construction[1] 2025 (planned)[1] 500[1] Onshore Power Company of Wyoming LLC[2]
1B Construction[1] 2025 (planned)[1] 500[1] Onshore Power Company of Wyoming LLC[2]
1C Construction[1] 2025 (planned)[1] 500[1] Onshore Power Company of Wyoming LLC[2]
2A Construction[1] 2026 (planned)[1] 750[1] Onshore Power Company of Wyoming LLC[2]
2B Construction[1] 2026 (planned)[1] 750[1] Onshore Power Company of Wyoming LLC[2]


Location

Table 2: Phase-level location details for Chokecherry And Sierra Madre Wind Energy Project

Phase name Location Coordinates (WGS 84)
1a Carbon County, Wyoming, United States[1] 41.6831, -107.2000 (exact)[1]
1b Carbon County, Wyoming, United States[1] 41.6831, -107.2000 (exact)[1]
1c Carbon County, Wyoming, United States[1] 41.6831, -107.2000 (exact)[1]
2a Carbon County, Wyoming, United States[1] 41.6831, -107.2000 (exact)[1]
2b Carbon County, Wyoming, United States[1] 41.6831, -107.2000 (exact)[1]

The map below shows the exact location of the wind farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
  2. 2.0 2.1 2.2 2.3 2.4 "Power Company of Wyoming: Chokecherry and Sierra Madre Wind Energy Project". Archived from the original on August 16, 2021. Retrieved August 24, 2021.