Chongqing Shuanghuai power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Chongqing Shuanghuai power station (国家电投重庆合川双槐电厂) is an operating power station of at least 1920-megawatts (MW) in Shuanghuai, Hechuan, Chongqing, China with multiple units, some of which are not currently operating. It is also known as Shuanghuai power station, Daba power station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Chongqing Shuanghuai power station Shuanghuai, Hechuan, Chongqing, China 30.1611074, 106.5480599 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 30.1611074, 106.5480599

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - bituminous 300 subcritical 2006
Phase I Unit 2 operating coal - bituminous 300 subcritical 2006
Phase II Unit 3 operating coal - bituminous 660 ultra-supercritical 2013
Phase II Unit 4 operating coal - bituminous 660 ultra-supercritical 2014
Phase III Unit 5 permitted coal - unknown 1050 ultra-supercritical 2026
Phase III Unit 6 permitted coal - unknown 1050 ultra-supercritical 2026

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 State Power Investment Group Chongqing Hechuan Power Generation Co Ltd [100.0%]
Phase I Unit 2 State Power Investment Group Chongqing Hechuan Power Generation Co Ltd [100.0%]
Phase II Unit 3 State Power Investment Group Chongqing Hechuan Power Generation Co Ltd [100.0%]
Phase II Unit 4 State Power Investment Group Chongqing Hechuan Power Generation Co Ltd [100.0%]
Phase III Unit 5 State Power Investment Group Chongqing Hechuan Power Generation Co Ltd [100.0%]
Phase III Unit 6 State Power Investment Group Chongqing Hechuan Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): March 2005, March 4, 2023, January 2011

Background

The two first coal-fired power units of Shuanghuai power station, totaling 600 MW, were brought online in 2006. The plant was owned by CPI and Chongqing Energy Investment Group.[1]

Second Phase

The plant's owners planned to build two additional coal-fired units at this plant, with a total planned capacity of 1,320 MW as of 2014.[2][3][4][5]

Units 3 and 4 were completed in June 2013 and September 2014 respectively.[6] [7][8]

Third Phase

According to a 2023 EIA document linked on the SPIC website and available in the Baidu Cloud, a third phase may have been under consideration since 2013 and on hold until the end of 2022, when it was revived to satisfy electricity demand from Chongqing. In November 2022, the Chongqing DRC issued a "Letter on Accelerating the Promotion of the Hechuan Shuanghuai Phase III Coal-fired Power Project."[9] In December 2022, the SPIC Chongqing Hechuan Power Generation Co., Ltd. entrusted Chongqing Huankeyuan Boda Environmental Protection Technology Co., Ltd. to carry out the environmental impact assessment,[10] and the Energy Bureau issued a notice regarding the expansion in the City's 14th Five-Year Electricity Development Plan. The project was featured in Chongqing's key projects list for 2023 under new construction.[11]

In March 2023, bidding for a 2 x 1,050 MW expansion was underway[12][13]

The expansion was permitted on March 4, 2023 (渝发改能源【2023】284号) according to the EIA report.[9] In April 2023, a pre-announcement regarding land acquisition was also circulated.[14]

Ownership

In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[15]

Articles and Resources

References

  1. "Coal-Fired Plants in Chongqing," Power Plants Around the World, November 2014.
  2. "重庆合川双槐电厂二期扩建3#机组工程水土保持设施通过水利部验收,",长江水土保持网, 2014-05-04
  3. "市水利局对双槐电厂二期扩建铁路专用线工程水保设施进行验收,", 重庆市水力局, 2014-08-03
  4. "ZTPC Erects First Beam of Boiler for First Unit of Chongqing Shuanghuai Power Plant's Phase II Expansion," Industrial Info Resources China, February 9, 2012
  5. "西南院设计的重庆合川双槐电厂二期3号机组被中电投命名为达标投产机组,",中国能建, 2014-04-25
  6. 合川发电公司4号机顺利完成168小时试运行, China Power Investment Corporation, 14.09.01
  7. "重庆合川电厂3号机组并网发电"中国能源报, 2013-05-31
  8. "合川双槐电厂二期4号机组通过168小时试运行"中国火力发电网 , 2014-9-4
  9. 9.0 9.1 Document available at 国家电投集团重庆合川发电有限公司合川双槐电厂三期2×1050MW机组扩建工程项目环境影响评价公众参与报批前公示, spiccq, 2023-04-17
  10. 国家电投集团重庆合川发电有限公司重庆合川双槐电厂三期2×1050MW机组扩建工程环境影响评价公众参与第一次公示信息, spiccq, 2022-12-10
  11. 重庆市人民政府办公厅关于做好2023 年市级重点项目实施..., cq.gov.cn, April 5, 2023
  12. 国家电投集团重庆电力有限公司二〇二三年度第二批集中招标招标公告, cnpowerbid, 2023-03-10
  13. 重庆合川双槐三期 2×1050MW煤电项目接入系统设计招标公告, dlztb, 2023-03-13
  14. 重庆市合川区人民政府,关于征收土地的预公告, hc.gov.cn, 2023-04-11
  15. "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.