Chuo Trunk Line Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Chuo Trunk Line Gas Pipeline is an operating natural gas pipeline in Japan.[1]
Location
The first phase pipeline runs from Edogawa Ward, Tokyo to Soku, Saitama. The second phase of the pipeline runs from Soku to Kawaguchi city, Japan. [1]
Project Details
- Operator: Tokyo Gas
- Parent Company: Tokyo Gas
- Current Capacity:
- Proposed Capacity:
- Length: 20.38 mi / 32.8 km
- Phase one: 14.42 mi / 23.2 km
- Phase two: 5.97 mi / 9.6 km
- Status: Operating
- Start Year:
- Phase one: October 2009
- Phase two: October 2010
Background
The pipeline operates at a pressure of 7.0 MPa and has a diameter of 600 mm.[1]
Articles and resources
References
- ↑ 1.0 1.1 1.2 Outline of Supply Plans, Tokyo Gas, March 2008