Cirencester solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Cirencester solar farm is an operating solar photovoltaic (PV) farm in Cotswold District, Gloucestershire, South West, England, United Kingdom.
Project Details
Table 1: Phase-level project details for Cirencester solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Operating[1] | 2022[1] | 23 MWp/dc[1] | PV[2] | Warrington Borough Council [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Cirencester solar farm
Location | Coordinates (WGS 84) |
---|---|
Cotswold District, Gloucestershire, South West, England, United Kingdom[1] | 51.7109, -1.9217 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27.
{{cite web}}
: Check date values in:|date=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240207071232/https://renews.biz/82196/statkraft-to-optimise-cirencester-solar-farm/. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help)