Cisne (Soluz) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Cisne (Soluz) solar farm (Parque solar fotovoltaico Cisne) is a solar photovoltaic (PV) farm in pre-construction in Marchamalo, Guadalajara, Castilla-La Mancha, Spain.
Project Details
Table 1: Phase-level project details for Cisne (Soluz) solar farm
Phase name | Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
1 | Pre-construction[1] | 50 MWp/dc[2] | PV[3] | Soluz [100%][3] | Aton Fotovoltaicas[4] |
2 | Pre-construction[1] | 50 MWp/dc[2] | PV[3] | Soluz [100%][3] | Aton Fotovoltaicas[4] |
3 | Pre-construction[5] | 50 MWp/dc[6] | PV[3] | Soluz [100%][3] | Aton Fotovoltaicas[4] |
4 | Pre-construction[7] | 50 MWp/dc[8] | PV[3] | Soluz [100%][3] | Aton Fotovoltaicas[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Cisne (Soluz) solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Marchamalo, Guadalajara, Castilla-La Mancha, Spain[2] | 40.6545, -3.2054 (approximate)[2] |
2 | Marchamalo, Guadalajara, Castilla-La Mancha, Spain[2] | 40.6545, -3.2054 (approximate)[2] |
3 | Marchamalo, Guadalajara, Castilla-La Mancha, Spain[2] | 40.6545, -3.2054 (approximate)[2] |
4 | Marchamalo, Guadalajara, Castilla-La Mancha, Spain[2] | 40.6545, -3.2054 (approximate)[2] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2592, https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 "BOE-A-2023-2592 Resolución de 18 de enero de 2023, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula la declaración de impacto ambiental del proyecto «Parques solares fotovoltaicos "FV Cisne I" 49,95 MWp, FV Cisne II" 49,95 MWp, FV Cisne III" 49,95 MWp y "FV Cisne IV" de 49,95 MWp en Guadalajara y Marchamalo (Guadalajara)»". Boletín Oficial del Estado. 2023-01-31. Archived from the original on 2024-03-26. Retrieved 2024-03-22.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 "Cepsa, Iberdrola y Solaria son las empresas que más potencia fotovoltaica presentaron en 2022". Energía Estratégica España. 2023-01-03. Archived from the original on 2024-02-01.
- ↑ 4.0 4.1 4.2 4.3 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-22374, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-22375 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2592, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-22374, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-22375.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-22375 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2592, https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-22375.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ "BOE-A-2023-22375 Resolución de 20 de octubre de 2023, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Aton Fotovoltaicas, SL, de autorización administrativa previa del parque solar fotovoltaico Cisne III, de 49,95 MWp". Boletín Oficial del Estado. 2023-11-01. Archived from the original on 2024-03-26. Retrieved 2024-03-22.
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-22374, https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2592, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-22374, https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ "BOE-A-2023-22374 Resolución de 20 de octubre de 2023, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Aton Fotovoltaicas, SL, de autorización administrativa previa del parque solar fotovoltaico Cisne IV, de 49,95 MWp". Boletín Oficial del Estado. 2023-11-01. Archived from the original on 2024-03-26. Retrieved 2024-03-22.